The Project HETSI results are now available !
In this design, amorphous silicon (a-Si:H) constitutes both “emitter” and “base-contact” (while offering interesting surface passivating layers) onto both sides of a thin crystalline silicon wafer-base (c-Si). ************************************************************ The project is now running for 2 years and big achievements have been obtained on almost all Work packages. Significant results have been obtained on WP2 dealing with characterisation and simulation. Indeed, 1D simulation results obtained with 2 different softwares (coming from different partners: HZB and CNRS) have shown an excellent correlation between them. AFORS-HET has been chosen for 1D simulation due to its versatility and robustness. SILVACO will be used for 2D simulation, especially for RCC-HET structures. These two softwares have been up graded, to take into account additional physical phenomena. Concerning Characterization techniques, the use of both surface photovoltage, photoluminescence in DC and AC modes, spectroscopic ellipsometry, µPCD, QSSPC, capacitance and planar conductance measurements have given a better knowledge of band offsets and the analysis of recombination at the heterointerface has been improved. Significant improvements have been obtained on Work package 3. The main achievement in this task within the reporting period is EPFL’s development of wet-chemical processes that lead to cell efficiencies > 19% on 2x2cm² cells. At CNRS, plasma conditions have been optimized for cleaning the c-Si surface that led to equivalent surface passivation as HF. Moreover, First results for a HET cell with a dry cleaning process have been achieved: the best Voc so far is 693 mV. Finally, outstanding passivation level with solar cell precursors have been obtained with Voc implied up to 720 mV. Concerning mc-Si substrates, some Etch-polished and cleaned mc-Si samples from Photowatt passivated with 20nm (i)a Si:H have resulted in a (spatially averaged) carrier lifetime of 314µs at 1015 cm-3, and an implied Voc of 664mV at one sun. This is an excellent value for mc-Si substrates. The Round Robin experiment on transparent conductive oxide in WP4 have been almost finalized (D4.2). In particular, TCO layers consisting of ITO, ZnO:B and ZnO:Al, also fabricated by different deposition methods, have been tested and compared. For layers with anti reflection thickness, sheet resistivities below 50 Ohm Sq and transparencies higher than 85% over the relevant wavelength range have been obtained. For thicker layers, mobilities above 40 cm2/Vs have been measured. We have also performed some metallization tests with different low temperature screen printed pastes from different suppliers. We have demonstrated that some of these pastes are achieving the targeted values for contact resistivity on ITO. Nevertheless, the resistivity is still too high with a single print process. In order to allow sufficiently low series resistance and a high aspect ratio, a multiple print process should be considered. Finally, these metallizations have been applied to real large area solar cells with appropriate multiple prints and Fill Factors up to 78% have been obtained. The consortium has also obtained excellent results within WP5. INES has processed 125 Pseudo square solar cells with efficiencies up to 19,5 % for FZ and 19% for CZ wafers. First tests on mc-Si have allowed to obtain up to 15,5 % on square 125 mm wafers and 640 mV. EPFL has also obtained excellent results with efficiencies higher than 19 % on 2*2 cm² with large area PECVD reactors. WP6 dealing with RCC-HET structure has fulfilled its objectives with surface passivation of the front surface lower than 50 cm/s and a proof of concept has been realized for RCC-HET structure with efficiencies up to 15 % on 1 cm². Module process (WP7) is also under progress with satisfying results, even if the number of cells available is low. First modules with large area solar cells have been processed with conductive adhesives for interconnection. Damp heat tests have shown that an aluminium foil at the back is necessary to prevent from moisture penetration due to the sensitivity of ITO. The minimum number of cells required to address properly the different issues have been estimated by both ECN and SOLON (for M24 to M30). INES will take care of this issue in order to provide the 26 cells needed by the consortium as soon as possible during this period. The first bifacial NICE (new industrial cell encapsulation) module has been processed with 4 cells. The module is functional and the rear surface exhibit 85 % efficiency of the front side. Nevertheless, fill factors has to be improved due to problems of interconnection and internal pressure into the module. Finally, in WP8, a second estimation of costs has been established by the partners of WP8 with more realistic hypothesis thanks to a more precise process flow. To conclude, all the Work packages are under satisfying progress, nearly all initial deliverables due for T0+18 and T0+24 have been fulfilled. Minor modifications were necessary due to factual reasons such as mc-Si availability, solar cells availability for modules, string ribbon issues availability ,etc… corresponding to the normal life of a successful project.