Information systems Engineering: EUROMETHOD Version One, Phase 3(a)
A call for proposals regarding EUROMETHOD Version 1 is launched for the technical area identified following the Phase 2 feasibility study. Phase 3(a) covers the information system life span from development of strategy to implementation, focusing on the external design component (scope: business systems/knowledge based systems option). Development is of an operational support system including MIS with office automation as an option. The project aims at IS development in specific applications, package based IS, and application maintenance with re-engineering as an option. Technical completion should be within 15-18 months.Information is obtained from: Directorate-General for Telecommunications, Information Industries and Innovation, DG XIII/E Attn. K. Thompson / C. Roberts, Brey 6/41 200 rue de la Loi B-1049 Brussels Tel. +32-2-2351270/2352515