CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
Biochar samples produced during gasification tests of WP4 will be characterised with respect to chemical composition and combustion properties storability and other characteristics that govern its suitability borth for energy and material usage The characterisation results are summarised in this report This deliverable is related to Task 61
Report on FlexSNG environmental analysis (opens in new window)Report on the environmental assessment of the proposed FlexSNG concept according to pre-defined widely acceptable standards (ISO 14044), including sensitivity analysis. This deliverable is related to Task 8.2.
Report and a short dissemination video of the first Industrial Topical Workshop (opens in new window)A short video will be prepared in occasion of the first Industrial Topical Workshop for promotional purposes along with a report that summarises the highlights of the workshop The workshop presentations will be made available on the project website This deliverable is related to Task 93
Techno-economic assessment report for the Central European case studies (opens in new window)Report on the techno-economic performance of FlexSNG in the different case study scenarios in Central European context. The results of at least two case studies are presented. This deliverable is related to Task 8.1.2.
Summary report of biomethane utilization pathways (opens in new window)The gaseous bioenergy carrier biomethane will be investigated regarding its use for transportation fuel in a gasCHP storage in the gas grid as well as shipping as liquefied natural gas will be examined The most appropriate uses are identified from the economic viewpoint and maximization of the energy systems flexibility and summarised in this report This deliverable is related to Task 63
Communication and Dissemination Plan (C&DP) and periodic updates (opens in new window)A Communication and Dissemination Plan (C&DP) will include: 1) definition of target groups and key content to be shared with each group, 2) communication measures with each target group, and 3) a tentative timeline for dissemination/communication activities. The C&DP will be updated twice during the project (M18&M36). This deliverable is related to Task 9.1.
Definition of the FlexSNG process configurations (opens in new window)This report presents the FlexSNG process configurations developed for biorefirery cityrefinery and hybrid applications including simplified process flow charts and descriptions of main unit operations This deliverable is related to Task 72
Presentation/article on the extended-time validation tests with the FlexSNG process (opens in new window)A conference presentation or a joint article that summarises the results gained from extended-time validation experiments of Task 5.2. This deliverable is related to Task 5.2.
Techno-economic assessment report for the South European case studies (opens in new window)Report on the techno-economic performance of FlexSNG in the different case study scenarios in South European context. The results of at least two case studies are presented. This deliverable is related to Task 8.1.3.
Report on biomass residue and waste feedstock potential assessment in Europe and Canada (opens in new window)This report summarises the availability quality and costs of sustainably available biomass residue and waste feedstocks in target regions in Europe and Canada This deliverable is related to Task 21
Conference presentation: Preliminary results of gasification process development (opens in new window)A conference presentation that introduces the FlexSNG concept and summarises the preliminary gasification test results with the novel BCFB gasifier design. The presentation summarises the work conducted in Tasks 4.2-4.3.
Report and a short dissemination video of the second Industrial Topical Workshop (opens in new window)A short video will be prepared in occasion of the second Industrial Topical Workshop for promotional purposes along with a report that summarises the highlights of the workshop. The workshop presentations will be made available on the project website. This deliverable is related to Task 9.3.
Techno-economic assessment report for the Canadian case studies (opens in new window)Report on the techno-economic performance of FlexSNG in the different case study scenarios in Canadian context. The results of at least two case studies are presented. This deliverable is related to Task 8.1.4.
Report on the development and optimisation of oxygen membranes for biomass gasification (opens in new window)A summary report on the lab-scale development and optimization of oxygen transport membranes for use in biomass gasification, with a target of 50 % reduced energy consumption compared to state-of-the-art oxygen production methods. This deliverable is related to Task 3.1.
Report on low-cost collection/harvesting, pre-processing and handling strategies tailored for biomass/waste feedstocks of FlexSNG (opens in new window)This report defines the lowcost harvestingcollection preprocessing and handling strategies for the targeted feedstocks based on biomasswaste quality data collected in Task 21 and the feedstock quality specifications and boundary conditions set by the gasification process This deliverable is related to Task 22
Techno-economic assessment report for the North European case studies (opens in new window)Report on the techno-economic performance of FlexSNG in the different case study scenarios in North European context. The results of at least two case studies are presented. This deliverable is related to Task 8.1.1.
Report of an integrated co-handling approach for forest and agro feedstocks (opens in new window)This report describes the pros and cons of using an integrated cohandling approach for forest and agrofeedstocks and assesses the possibility of quality design through mixing of different assortments costsavings by sharing of resources added delivery security and economy of scale This deliverable is related to Task 23
Determination of KPIs for the proposed process concepts (opens in new window)Key Performance Indicators KPIs that have been determined for the FlexSNG process are introduced These technical economic and environmetal metrics will be used in the overall system evaluation and impact assessments of WP7WP8 This deliverable is related to Task 71
Quality Assurance Plan (QAP) (opens in new window)A Quality Assurance Plan QAP describes the quality and risk management procedures that will be applied in the project It will include the governance structure communication flows and methods the detailed procedure for internal reporting from task level to GA level the detailed procedure for internal peerreview of deliverables and periodic reports consortium contact information and responsible personsparticipants from GA to task level project templates conflict resolution procedures and risk management procedure This deliverable is related to Task 13
The first electronic newsletter and a promotional leaflet will be prepared by month 6 with the purpose of raising awareness of the FlexSNG concept and the project objectives This deliverable is related to Task 922
Project website established and social media launched (opens in new window)The project website which will serve as the main project reference at digital level will be established and put online at the project outset Complementary social media accounts will also be created for the project eg in LinkedIn for sharing project updates This deliverable is related to Task 92
A Data Management Plan (DMP) describes the data management methods applied in the project (incl. descriptions on how the data will be generated, processed, collected, stored and documented). The Data Management Plan also includes a description of methodology and standards to be followed, and what data sets are exploitable or made accessible for verification and re-use. This deliverable is related to Task 1.3.
Publications
Author(s):
Esa Kurkela, Minna Kurkela, Sanna Tuomi
Published in:
CHEMICAL ENGINEERING TRANSACTIONS, Issue Vol. 92, 2022, 2022, ISSN 2283-9216
Publisher:
The Italian Association of Chemical Engineering
DOI:
10.3303/cet2292065
Author(s):
Kiebach, Ragnar; Pirou, Steven; Aguilera, Lev Martinez; Haugen, Astri Bjørnetun; Kaiser, Andreas; Vang Hendriksen, Peter; Balaguer, María; García-Fayos, Julio; Serra, José Manuel; Schulze-Küppers, Falk; Christie, Max; Fischer, Liudmila; Meulenberg, Wilhelm Albert; Baumann, Stefan
Published in:
Journal of Materials Chemistry A, Issue Vol. 10, 2022, 2022, ISSN 2050-7496
Publisher:
Royal Society of Chemistry
DOI:
10.1039/D1TA07898D
Author(s):
Lev Martinez Aguilera, Stéven Pirou, Peyman Khajavi,Julio García-Fayos, Jose Manuel Serra, Henrik Lund Frandsen, Peter Vang Hendriksen, Andreas Kaiser, Ragnar Kiebach,Astri Bjørnetun Haugena
Published in:
Open Ceramics, Issue Vol. 11, 2022, 2022, ISSN 2666-5395
Publisher:
Journal Open Ceramics
DOI:
10.1016/j.oceram.2022.100292
Author(s):
Marina Stella Silva Pimenta, Francis Lebreux Desilets, Adriano Pinto Mariano, Virginie Chambost, Alain Boutet, Paul R. Stuart
Published in:
Biofuels, Bioproducts and Biorefining, 2025, ISSN 1932-104X
Publisher:
John Wiley & Sons Ltd.
DOI:
10.1002/bbb.2729
Author(s):
VTT Technical Research Centre of Finland
Tuomi, Sanna
Hiltunen, Ilkka
Kurkela, Esa
Published in:
tcbiomass 2024 Conference Proceedings, 10-12 September, 2024, 2024
Publisher:
tcbiomass2024
Author(s):
CERTH: Konstantinos Atsonios, Panagiotis Tatoulis, VTT: Sanna Tuomi, CERTH: Panagiotis Grammelis
Published in:
ICEESEN 2024-Proceedings, 2024
Publisher:
Cappadocia University
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available