Periodic Reporting for period 2 - RECONMATIC (Automated solutions for sustainable and circular construction and demolition waste management)
Reporting period: 2024-01-01 to 2025-06-30
- Evaluation of Current Practices and Policies in the EU and the UK (report)
- Digital Information Management System (report for methodology of DIMS)
WP2:
- Framework of data fom material/product mapping - methodology towards national product databanks with potential linking with digital product passports, technical data sheets or EPDs
- Designing and specification of schema, implementation mechanism and process map for WASTEie data standard
- Waste prediction tool drafted
- Development of smart order-delivery-logistics tool with focus on designing a web dashboard enhanced by blockchain
WP3:
- Development of algorithms for paper 2D drawings to digital model (DM) with testing on real building examples. Improving it by incorporating augmented reality information.
- Development of algorithms for automated generation of (DM) from 3D scanning point clouds. Training on selected buildings for automated pre-demolition audit.
- Developing a joint flow map and data structure with identification of processes and classifications during the whole life cycle of a built asset project used in pre-demolition audits.
- Digital app linking digital models with product data to automate pre-demolition audits
WP4:
- Identifiction of inherent inefficiencies in existing systems, leading us to develop a custom measurement line equipped with RGB cameras and various transducers, has been the cornerstone of our research, aiming to revolutionize CDW recycling through enhanced sorting accuracy.
- Fusion of data from different sensors in improving classification performance and adapting these innovations for industrial-scale applications (scaling up sensor network and enhancing machine learning models).
WP5:
- Sequential identification of technical parameters to enable better valorisation for 10 selected materials
- NDT analyses used during the operational stage in buildings and infra
- Collection of case studies for effective material recycling for identified types of waste materials
WP6:
- Analysis for circularity tool (to define how the guidance tool can complement decision-making processes).
- Analysis of reference documents and regulations to be considered in the tool's development and stakeholder interviews to determine the functional requirements.
- Definition of content and basic structure of the tool with 5 dimensions, incl. selection of relevant indicators (prototyping a tool).
• Further Research: Continued exploration and refinement of the developements in WP 2-5 to enhance efficiency and applicability.
• Demonstration: Real-world testing to showcase the practical benefits and scalability of the solutions especially dealing with digital models or twins, enhanced extensions to BIM emphasizing CDW management in particular phases of building/infrastructure life, automated sorting of waste inlcuding a robotic prototype for fine-sorting of selected CDW materials. For the assessment tool it is intended to fill the gaps left by existing sustainable building certification schemes or green building rating systems and standards (currently under development by CEN) in relation to the sustainable and circular management of CDW.
• Commercialization: Strategies for transforming these technological advancements into viable commercial products. This is ongoing supported by dissemination activities, networking and clustering events which act as positive actions to achieve this objective.
• Expanding the reach of the developed technologies to global markets, cintinous work in clustering and exchange with other running or recently finished pro European projects.
• Advocating for policies and standards that favor the adoption of such sustainable technologies.