Skip to main content
An official website of the European UnionAn official EU website
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Aerospace Districts: Acceleration of the Strategic Transfer of Regional Advancements

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Initial report on the SWOT analysis, relevant networks, and innovation barriers mitigation

This report will collect the intermediate information collected by the initial SWOT analysis performing in the different ecosystems Each SWOT will be done by local partner following a framework done by TM This common framework will allow to have a global view of the different ecosystems allowing future connections or collaborations

Action Plan

The action plan will outline present and foreseen future connections among the ecosystems, identifying key technologies transferrable to and from the aerospace sector, actual regional gaps, and corrective activities to overcome these gaps and the operative modes to avoid competition barriers to the transfer of knowledge and technologies. The action plan will also evaluate the replicability of good practices from one region to others, and the eventual corrective actions to be held in order to overcome possible specific criticalities of territories.

Megatrends and future developments analysis

Overview of megatrends with possible effect on the various aerospace regions with regional examples of copingpreparing for a changing world and interregional realistic or futuristic scenarios to work together successfully in dealing with and possibly anticipating a megatrend and how to benefit from it

Innovation inventory

Report describing the stakeholders relevant innovation and technical capabilities in each region involved in the project and any international connection

Former successful connections and case studies

Cartography of the existing and past connections underlining the success cases between members of different ecosystems and the ecosystems themselves

Report on the interregional workshops and exchange activities

This deliverable will report the outcomes of the interregional co-creation workshops, in particular focusing on exchange and dissemination of existing knowledge in the field of aerospace and provide essential inputs for innovation (including challenges faced by the aerospace sector, way of collaboration among regions, knowledge transfer, concrete suggestions and inputs from the local audience to start triggering new business or research ideas).

Final report on the SWOT analysis, relevant networks, and innovation barriers mitigation

This report will collect all the information collected by the complete SWOT analysis performed in the different ecosystems. Each SWOT will be done by local partner following a framework done by TM. This common framework will allow to have a global view of the different ecosystems, allowing future connections or collaborations.

Report on the foreseen impacts and potential beneficiaries

This deliverable will report information on the identification of the impacts of the foreseen actions, and the beneficiaries potentially involved. In particular, the impacts will not cover exclusively the aerospace districts of each region, but also other industrial ecosystems.

Communication kit

The communication kit is a set of templates docx pptx based on the visual identity of the project and that will be created for dissemination materials

Project website

This the public website of the project

Final data management plan (DMP)

The Data Management Plan will contain the data management structure and the rules that will apply during the project life cycle, and after the project end. The Final version of this plan will gather all the information collected during the project and will be valid after the project end (for a specific period).

Initial data management plan (DMP)

The Data Management Plan will contain the data management structure and the rules that will apply during the project life cycle and after the project end for a specific periodThe initial version of this plan will be mainly applied during the project life cycle

There was an error trying to search data from OpenAIRE

No results available