Self installing wind turbine

Objective

Participants plan to demonstrate to the offshore wind industry the realisation of a novel offshore wind turbine concept using a suction pile foundation. The subject concept allows installation of the complete wind turbine, substructure and suction pile foundation offshore in one piece. The concept is virtually independent of the water depth as floating equipment is utilised. This allows offshore wind parks to be installed in deeper waters out of sight from the coastline.

The marine spread required comprises a flat top barge, tugs, lowering system and suction pumps. These items are relatively cheap and widely available. In port the complete substructure with suction piles, tower and turbine will be erected and constructed as one unit. The complete unit will be supported on the end or corner of the barge and hung-off using a special frame. The unit will seafastened to the barge and is then ready for sailaway to the offshore location.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

FP6-2004-TREN-3
See other projects for this call

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

STREP - Specific Targeted Research Project

Coordinator

SUCTION PILE TECHNOLOGY BV
EU contribution
No data
Address
Korenmolenlaan 2
WOERDEN
Netherlands

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data

Participants (3)

My booklet 0 0