Objective
The protection of the national infrastructures is one of the main issues for national and international security. While FP7 MICIE project has proved that increasing cooperation among infrastructures increases their level of service and predictive capability, it is not enough to effectively counteract threats such as cyber attacks. Such attacks could be performed blocking communication from central SCADA to local equipments or inserting fake commands/measurements in the SCADA-field equipment communications (as happened with STUXNET worm). The paradox is that critical infrastructures massively rely on the newest interconnected (and vulnerable) ICT technologies, while the control equipment is typically old, legacy software/hardware. Such a combination of factors may lead to very dangerous situations, exposing systems to a wide variety of attacks. To overcome such threats, the CockpitCI project aims on one hand to continue the work done in MICIE by refining and updating the on-line Risk Predictor deployed in the SCADA centre, on the other hand to provide some kind of intelligence to field equipment, allowing them to perform local decisions in order to self-identify and self-react to abnormal situations induced by cyber attacks. It is mandatory to operate both at SCADA control centre and at field equipment because it is very dangerous to let field components operate autonomously. To address this issue an hybrid validation system will be implemented: at the Control Centre level an “Integrated On-line Risk Predictor” will provide the operator with qualitative/quantitative measurements of near future level of risk integrating data coming from the field, from other infrastructures, and from smart detection agents monitoring possible cyber attacks; at field level, the system is complemented with a smart software layer for field equipment and a detection system for the TLC network. The system will be validated on real equipment and scenarios provided by Israel Electric Corp.
Fields of science (EuroSciVoc)
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
FP7-SEC-2011-1
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
00195 Roma
Italy
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participants (13)
Participation ended
1855 LUXEMBOURG
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
4362 Esch Sur Alzette
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
00195 Roma
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
00154 ROMA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
00196 ROMA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
31000 Haifa
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
6831 Berbourg
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
7000 Mons
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
3004-531 COIMBRA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
GU2 7XH Guildford
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
030786 BUCURESTI SECTOR 3
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
4017 Stavanger
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
00131 ROMA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.