Objective
Over 1000 EU SMEs are involved in tyre retreading and supply to this industry. Retreading is the process of recycling a used tyre via removal of the worn tread and addition of new tread. During the process each used tyre must be inspected to determine whether it is fit for retread or should be scrapped due to irreparable damage.
The inspection process begins with a visual inspection and is generally complemented by further inspection using non-destructive test equipment. Currently available commercial equipment, such as x-ray, shearography and ultrasound, is too costly for SMEs, bulky, time consuming and in many cases proprietary- developed by the major manufacturers for their exclusive use.
EU tyre legislation means that dependency on the experience of qualified operators is no longer sufficient in assuring tyre quality thus leaving retreading SMEs in a critical situation. A real need has been manifested by Retread Associations for a fast, easy to use, low cost casing inspection machine to enable their SME retreaders to secure retread quality and avoid wasting resources on unsuitable casings.
This project will develop a tyre casing inspection machine (tyretest) to complement the manual inspection of used truck casings in order to reduce operating costs, consistently deliver product quality and safety, as well as promote the recycling and reuse of tyres. The use of pulse-echo ultrasound will represent a real innovation and Tyretest will perform non-destructive inspection of the tyre sidewalls, shoulders and crown area in a total test time of 1.5 minutes.
The inspection is designed to identify any internal tyre defects which could render the retreaded tyre unfit for use. Introducing a low cost and easy to operate inspection technique would enable SMEs to become more competitive through better selection of used tyres for retreading, which would increase the quality of the end product, which would in turn increase the acceptance of retreaded tyres.
Fields of science (EuroSciVoc)
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.
- engineering and technology environmental engineering waste management waste treatment processes recycling
- natural sciences physical sciences acoustics ultrasound
You need to log in or register to use this function
Keywords
Project’s keywords as indicated by the project coordinator. Not to be confused with the EuroSciVoc taxonomy (Fields of science)
Project’s keywords as indicated by the project coordinator. Not to be confused with the EuroSciVoc taxonomy (Fields of science)
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
FP6-2004-SME-COLL
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
BUDAPEST
Hungary
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
Participants (18)
LEIDEN
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
MADRID
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
BUDAPEST
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
TOURS
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
VJAL IL-QALBIENA MOSTIN - MOSTA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
FLORENCE
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
BELFAST
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
KRISTIANSAND S
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
TARTU
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
BRNO
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
BUDAPEST
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
FUENTES DE EBRO - ZARAGOZA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
AVILA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
MARINHA GRANDE
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
HERTFORD
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
BARCELONA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
BARCELONA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.
VJAL IL-MOSTIN QALBIENA - MOSTA
See on map
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.