Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Contenu archivé le 2024-06-18

Tidal Demonstration for Energy Scheme

Objectif

A full tidal array has not been installed anywhere, commercially to date. A number of the leading turbine manufacturers have part or full scale working prototypes which are under-going testing in various sites the majority of which are enclosed in semi-test environments. In order to move this nascent technology into the commercial arena and expedite market deployment, it is necessary to establish an array of turbines in one site to verify the performance capability and environmental characteristics of a full array.

The demonstration will also enable developers to make critical investment decisions based on the cost to market of deploying the technology, and manufacturers to establish likely interaction effects between machines which will inform their design. As with other technologies, notably wind, the manufacture and installation costs will drop as the technology matures.
The SPV will deliver one of the first operating tidal energy farms, located 2km off the coast of Antrim in Northern Ireland by 2017. Critically the Fair Head site is a scalable (to 100MW) open sea real site representative of a significant percentage of the near future exploitable tidal resource.
The TIDES project will produce many specific results which will benefit the industry as a whole:-

1. Prove the energy conversion potential of a tidal array in a real sea environment.
2. Develop viable financial models to support commercial exploitation.
3. Identify potential future energy cost reduction techniques including innovative installation methodologies.
4. De-risk tidal energy projects and make them more bankable.

The S&T objectives include addressing technical problems associated with the environment, demonstrating the deployment of an array, environmental assessment, generation and yield assessment.
The proposed consortium has an appropriate and replicable site, market leading technology and sufficient financial backing to ensure the project is built.

Mots‑clés

Appel à propositions

FP7-ENERGY-2012-2
Voir d’autres projets de cet appel

Coordinateur

DP Energy Ireland Limited
Contribution de l’UE
Aucune donnée
Adresse
MILL HOUSE
Buttevant Cork
Irlande

Voir sur la carte

Région
Ireland Southern South-West
Type d’activité
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contact administratif
Niamh Kenny (Ms.)
Liens
Coût total
Aucune donnée

Participants (6)