Management of AGing of I and C equipments in Nuclear Power Plants

Objective

Instrument and control (I&C) systems represent a critical part of Nuclear plant equipment. Several functions of I&C systems are directly safety related, such as the reactor protection system. The ageing of I&C equipment presents a risk for plant safety and availability. A number of utilities have experienced plant shutdowns after electronic failures due to ageing.

A plant shutdown is a transient initiator. Moreover, if ageing phenomena are not anticipated, the renovations costs may be prohibitive because of the increased downtimes and the lack of preparation of these renovations. There is therefore a common need: anticipate the generic ageing mechanisms as early as possible.

MAGIC coordination action gathers nuclear utilities and scientists and its objectives are to:
- ensure a desirable reliability level of I&C systems during the remaining life time of the I&C systems, so that the objective of safety of the plant can be achieved,
- ensure an homogeneous knowledge all over European nuclear utilities about the prevailing ageing mechanisms of I&C equipments, and the advanced tools (already used or under development) that are able to efficiently follow-up these mechanisms and to anticipate and plan refurbishments.
- ensure, until the end of life of each Nuclear Plant, the O&M staff knowledge, necessary to manage I&C ageing.

Here is a brief description of MAGIC actions:
- Create a European network of partners.
- Share utilities and scientific knowledge about: I&C ageing mechanisms, follow-up indicators, and corresponding tools to measure these indicators. A permanent common database will be developed and maintained.
- Share advanced tools to measure ageing indicators for each type of I&C equipment. The feasibility studies will be performed within the MAGIC CA but the subsequent development and tests will be funded with private funds.
- Create a training document for I&C operation and maintenance staff.

Call for proposal

EURATOM-2005-6-FIXEDDEADLINE
See other projects for this call

Coordinator

ELECTRICITE DE FRANCE
Address
22-30 Avenue De Wagram
Paris
France

See on map

Participants (9)

USTAV JADERNEHO VYZKUMU REZ A.S.
Czechia
Address
Husinec - Rez 130
Rez

See on map

BKW FMB ENERGIE AG
Switzerland
Address
Kernkraftwerk Muhleberg
Muhleberg

See on map

BRITISH ENERGY GROUP PLC
United Kingdom
Address
Systems House, Alba Campus
Livingston

See on map

VALTION TEKNILLINEN TUTKIMUSKESKUS (VTT)
Finland
Address
Vuorimiehentie 5
Espoo

See on map

ECOLE NATIONALE SUPERIEURE D'ELECTRONIQUE, INFORMATIQUE ET RADIOCOMMUNICATIONS DE BORDEAUX.
France
Address
1 Avenue Du Docteur Albert Schweitzer
Talence

See on map

VALSTYBINIS INFORMACINES TECHNOLOGIJOS INSTITUTAS
Lithuania
Address
Kalvariju G. 125
Vilnius

See on map

COMPAGNIE GENERALE DES MATIERES NUCLEAIRES
France
Address
Rue Paul Dautier 2
Velizy Villacoublay

See on map

BRITISH ENERGY GENERATION LTD
United Kingdom
Address
Barnett Way, Barnwood
Gloucester

See on map

Links
AGENCE NATIONALE POUR LA GESTION DES DECHETS RADIOACTIFS
France
Address
1-7 Rue Jean Monnet - Parc De La Croix Blanche
Chatenay Malabry

See on map