CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
D4.2 a), b) and c): Engagement and empowerment report for citizen science (LEG, R, PU, M12, M24, M33). M33 This report presents the intermediate results of citizen engagement with regards the three Citizen Science instantiations. This report includes national reports on the engagement activities and empowerment strategies achieved.
Scenario building workshop reports b.M36D7.2: Scenario building workshop reports, (G2000, R, PU, M24, M36). M36 1 per year in Spain, Italy and Austria. This report will inform about the progress in identifying ways to reach the sustainability of each testbed and citizen involvement. The report will contain a list of stakeholders, which are especially interested and suited for building up and hosting a test bed and to be part of the collective awareness platform. Especially in the Austrian regions there are numerous independent self sustaining “solar groups” who as pioneers in the solar technologies are technically and environmentally interested. The first report will especially look into the feedback of the stakeholders to the Exploitation and Sustainability Plan.
Offspring reportD7.4: Offspring report, (GUI, R, PU, M36). Report on offspring development, and expected future evolution.
Report on requirements and procedures for air pollution citizen science campaigns a.M3D3.1 a) and b): Report on requirements and procedures for air pollution citizen science campaigns (CSIC, R, PU, M3, M33). M3 Collects a set of requirements and procedures need to ensure the quality of the results obtained in a citizen science monitoring instantiation.
Report on data validation b.M24D3.3 a), b) and c): Report on data validation (CSIC; R, PU, M10, M24, M33). M24 Report containing the results of the comparison between sensor and reference data in each study region. To be produced each year.
Dissemination, Growth, exploitation and sustainability Report 1D7.3: Dissemination, Growth, exploitation and sustainability Report 1, (G2000, R, PU, M36). This report gives an update of the activities achieved. It will have a special focus on the involvement of the offsprings and other related stakeholders. It will include a draft of realistic model for sustainability and exploitation as it can rely on the experiences of the project. In order to implement the offsprings visits of the representatives of the interested stakeholders in the testbed-communities will be organized.
Release of electrochemical board design b.M18D22 a and b Release of electrochemical board design UBPLIMOS R PU M9 M18M18
Report on data validation a.M10D3.3 a), b) and c): Report on data validation (CSIC; R, PU, M10, M24, M33). M10 Report containing the results of the comparison between sensor and reference data in each study region. To be produced each year.
Exploitation and Sustainability Plan a.M12D7.1: Exploitation and Sustainability Plan, (G2000, R, PU, M12, M36). M12 This deliverable presents the initial plan for exploitation and sustainability and reports on the first measures taken to ensure a successful strategy. It will list up citizen initiatives and possible stakeholders who's goals and resources (funds, volunteers, etc.) can possibly be addressed. The final version will summarise the activities of WP7 and will have a special focus on the sustainability beyond the project duration, including alternative funding mechanisms and support structures. It will also report on the offspring activities and emerging new initiatives.
Report on requirements and procedures for air pollution citizen science campaigns b.M33D3.1 a) and b): Report on requirements and procedures for air pollution citizen science campaigns (CSIC, R, PU, M3, M33). M33 Collects a set of requirements and procedures need to ensure the quality of the results obtained in a citizen science monitoring instantiation.
Engagement and empowerment report for citizen science a.M12D4.2 a), b) and c): Engagement and empowerment report for citizen science (LEG, R, PU, M12, M24, M33). M12 This report presents the intermediate results of citizen engagement with regards the three Citizen Science instantiations. This report includes national reports on the engagement activities and empowerment strategies achieved.
Interim Impact Assessment ReportD5.2: Interim Impact Assessment Report (ZSI, R, PU, M24). This interim report discusses the evaluation activities performed until year 2 and the corresponding results. It will include an in depth analysis and mapping of the defined impact indicators on the project performance and inform other WPs on possible implications for the final project year.
Final Project ReportD1.5: Final Project Report (UPC, R, PU, M36) final public project report.
Scenario building workshop reports a.M24D7.2: Scenario building workshop reports, (G2000, R, PU, M24, M36). M24 1 per year in Spain, Italy and Austria. This report will inform about the progress in identifying ways to reach the sustainability of each testbed and citizen involvement. The report will contain a list of stakeholders, which are especially interested and suited for building up and hosting a test bed and to be part of the collective awareness platform. Especially in the Austrian regions there are numerous independent self sustaining “solar groups” who as pioneers in the solar technologies are technically and environmentally interested. The first report will especially look into the feedback of the stakeholders to the Exploitation and Sustainability Plan.
Report on data validation c.M35D3.3 a), b) and c): Report on data validation (CSIC; R, PU, M10, M24, M35). M35 Report containing the results of the comparison between sensor and reference data in each study region. To be produced each year.
Engagement and monitoringD4.1 Engagement and monitoring Plan, (LEG, R, PU, M6). This report includes a detailed participation and monitoring plan, with practical guidelines for citizens engaged in the project.
Release of electrochemical board design a.M9D22 a and b Release of electrochemical board design UBPLIMOS R PU M9 M18M9
Report on initial testing of sensor nodes a.M10D3.2 a) and b): Report on initial testing of sensor nodes (CSIC, R, PU, M10, M24). M10 Short summary of the results of the initial tests to identify potentially faulty nodes.
Impact Assessment PlanD5.1: Impact Assessment Plan (ZSI, R, PU, M12). This report describes the evaluation and impact assessment framework as well as the foreseen methods to assess the various project aspects. It will also include a set of potential impact indicators and report on first formative evaluation results.
Dissemination, communication and outreach report and Best practice catalogueD6.3: Dissemination, communication and outreach report including best practice catalogue, (EEA, R, PU, M33). Report including best practise catalogue on dissemination, communication and outreach.
Engagement and empowerment report for citizen science b.M24D4.2 a), b) and c): Engagement and empowerment report for citizen science (LEG, R, PU, M12, M24, M33). M24 This report presents the intermediate results of citizen engagement with regards the three Citizen Science instantiations. This report includes national reports on the engagement activities and empowerment strategies achieved.
Engagement and empowerment report for collaborative learning b.M24D4.3 a), b) and c): Engagement and empowerment report for collaborative learning (LEG, R, PU, M12, M24, M33). M24 This report presents the intermediate results of citizen engagement documenting the number of activities (e.g. “Air Quality days”, school project), people involved, training and dissemination material provided, etc in the three testbeds. This report includes national reports on the engagement activities and empowerment strategies achieved.
Engagement and empowerment report for collaborative learning a.M12D4.3 a), b) and c): Engagement and empowerment report for collaborative learning (LEG, R, PU, M12, M24, M33). M12 This report presents the intermediate results of citizen engagement documenting the number of activities (e.g. “Air Quality days”, school project), people involved, training and dissemination material provided, etc in the three testbeds. This report includes national reports on the engagement activities and empowerment strategies achieved.
Dissemination, communication and outreach planD6.1: Dissemination, communication and outreach plan (EEA, R, PU, M6). Detailed strategy on communication and dissemination.
Engagement and empowerment report for collaborative learning c.M33D4.3 a), b) and c): Engagement and empowerment report for collaborative learning (LEG, R, PU, M12, M24, M33). M33 This report presents the intermediate results of citizen engagement documenting the number of activities (e.g. “Air Quality days”, school project), people involved, training and dissemination material provided, etc in the three testbeds. This report includes national reports on the engagement activities and empowerment strategies achieved.
Final Impact Assessment ReportD5.3: Final Impact Assessment Report (ZSI, R, PU, M36). This report summarizes the evaluation results of the project and the validation of the overall impact at social, economical, political and scientific level. It will also include CAPTOR experience in performing according to RRI guidelines and possible implications for future implementation of the CAPTOR approach.
Requirement for CAPTOR platformD2.1: Requirement for CAPTOR platform (UPC, R, PU, M3). It describes the user needs, value propositions, architecture of services for the different ICT of the CAPTOR collective awareness platform.
Exploitation and Sustainability Plan b.M36D7.1: Exploitation and Sustainability Plan, (G2000, R, PU, M12, M36). M36 This deliverable presents the initial plan for exploitation and sustainability and reports on the first measures taken to ensure a successful strategy. It will list up citizen initiatives and possible stakeholders who's goals and resources (funds, volunteers, etc.) can possibly be addressed. The final version will summarise the activities of WP7 and will have a special focus on the sustainability beyond the project duration, including alternative funding mechanisms and support structures. It will also report on the offspring activities and emerging new initiatives.
Report on initial testing of sensor nodes b.M24D3.2 a) and b): Report on initial testing of sensor nodes (CSIC, R, PU, M10, M24). M24 Short summary of the results of the initial tests to identify potentially faulty nodes.
D2.5 a) and b): Release of CleanAir mobile app (UPC, OTHER, PU, M9, M18). M18
Release of CleanAir mobile app a.M9D2.5 a) and b): Release of CleanAir mobile app (UPC, OTHER, PU, M9, M18). M9
Release of estimation software a.M9D2.3 a) and b): Release of estimation software (UBP-LIMOS, OTHER, PU, M9, M24). M9
Release of collaborative learning platformD2.6: Release of collaborative learning platform (UPC, OTHER, PU, M9).
Release of estimation software b.M24D2.3 a) and b): Release of estimation software (UBP-LIMOS, OTHER, PU, M9, M24). M24
D6.2 a), b) and c): Dissemination material (EEA, DEC, PU, M12, M24, M33). M12 Material for the website, project identity, logo, flyers, video, audio-visual material, press material, etc).
Release of websiteD2.7: Release of website (ZSI, DEC, PU, M9). These are software and design releases for the different ICT tools used by the CAPTOR Collective Awareness platform. A first functional release will be produced at month 9. For some tools, and after a continuous improvement process, the final release will be produced at months 18 or 24.
Release of open data repositoryD2.4: Release of open data repository (UPC, DEC, PU, M9).
Dissemination material c.M33D6.2 a), b) and c): Dissemination material (EEA, DEC, PU, M12, M24, M33). Material for the website, project identity, logo, flyers, video, audio-visual material, press material, etc).
Dissemination material b.M24D6.2 a), b) and c): Dissemination material (EEA, DEC, PU, M12, M24, M33). M24 Material for the website, project identity, logo, flyers, video, audio-visual material, press material, etc).
Publications
Author(s):
A. Ripoll, M. Viana, M. Padrosa, X. Querol, A. Minutolo, K.M. Hou, J.M. Barcelo-Ordinas, J. Garcia-Vidal
Published in:
Science of The Total Environment, Issue 651, 2019, Page(s) 1166-1179, ISSN 0048-9697
Publisher:
Elsevier BV
DOI:
10.1016/j.scitotenv.2018.09.257
Author(s):
Jose M. Barcelo-Ordinas, Messaoud Doudou, Jorge Garcia-Vidal, Nadjib Badache
Published in:
Ad Hoc Networks, Issue 88, 2019, Page(s) 142-159, ISSN 1570-8705
Publisher:
Elsevier BV
DOI:
10.1016/j.adhoc.2019.01.008
Author(s):
Kroop Sylvana, Sch?fer Teresa, Kieslinger Barbara
Published in:
Frontiers in Environmental Science, Issue 4, 2016, ISSN 2296-665X
Publisher:
Frontiers in Environmental Science
DOI:
10.3389/conf.FENVS.2016.01.00010
Author(s):
Schäfer Teresa and Barbara Kieslinger
Published in:
Journal of science and communication, Issue Volume 15, issue 02, 2016, ISSN 1824-2049
Publisher:
Scuola Internazionale Superiore di Studi Avanzati (SISSA)
Author(s):
Jose M. Barcelo-Ordinas, Jorge Garcia-Vidal, Messaoud Doudou, Santiago Rodrigo-Munoz, Albert Cerezo-Llavero
Published in:
2018 IEEE Wireless Communications and Networking Conference (WCNC), Issue Yearly, 2018, Page(s) 1-6, ISBN 978-1-5386-1734-2
Publisher:
IEEE
DOI:
10.1109/wcnc.2018.8377051
Author(s):
Gulio Kerschbaumer and Andrea Minutolo
Published in:
Ecoscienza ARPA, Issue 3, 2017, Page(s) 33
Publisher:
Ecoscienza ARPA
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available