In order to meet the project main objective, the following sub-objectives will have to be reached:
• Establish technical specifications of the new EVIS;
• Adapt existing engine mounts for forward section and develop all-new engine mount for afterward section;
• Analyse ground test campaign results to able the optimization the EVIS design for a potential next phase (such as flight test)
After the definition of the techincal requirements with the engine manufacturer, the EVIS has been designed and manufactured.
A qualification testing has demonstrated its compliance to the specfications.
A important milestone has been reached with the delivery of the EVIS to the engine manufacturer and its installation of the ground test bench, in June 2019.
Then the engine ground test campaign has started until 2021.
The feedback of this test campaign was that the EVIS behaved perfectly, the vibration attenuation level reached the expected result.