Objetivo The aim of this project is to produce coke with a low level of anisotropic phases and a high degree of stabilisation to reduce susceptibility to breakdown in a blast furnace operating at high levels of coal injection. This will be done by reducing the amounts of high-grade coals and increasing the use of well mixed fine-grain coke/petroleum coke in the coke oven blend, without altering the coking time. The breakdown performance of this coke in a furnace operating at more than 200 kg/tonne coal injection will be tested. Programa(s) ECSC-STEELRES 8C - Medium-term guidelines (ECSC) for the programmes of technical steel research and of steel pilot/demonstration projects, 1991-1995 Tema(s) B - Reduction of iron ores Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador THYSSEN STAHL Aportación de la UE Sin datos Dirección Kaiser-Wilhelm-Strasse 100 47166 DUISBURG Alemania Ver en el mapa Coste total Sin datos