Objetivo A high temperature metallic filter has recently been developed. A pilot unit using this new filter will be installed on a full-size sinter plant to evaluate the filter in an industrial application. Other partners in the project will evaluate various filter materials as well as the implications of the metallic filter on recycling dusts collected and on the possibility of improving sinter strand operations to minimise the generation of corrosive and polluting components in the gas stream. Programa(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Tema(s) B - Reduction of iron ores Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador British Steel plc Aportación de la UE Sin datos Dirección Moorgate S60 3AR Rotherham Reino Unido Ver en el mapa Coste total Sin datos Participantes (3) Ordenar alfabéticamente Ordenar por aportación de la UE Ampliar todo Contraer todo CENTRO NACIONAL DE INVESTIGACIONES METALURGICAS España Aportación de la UE Sin datos Dirección Avenida Gregorio del Amo 8 28040 MADRID Ver en el mapa Coste total Sin datos CSI-PLANOS España Aportación de la UE Sin datos Dirección 33400 AVILES Ver en el mapa Coste total Sin datos INSTITUTO DE SOLDADURA E QUALIDADE Portugal Aportación de la UE Sin datos Dirección Estrada Nacional 249 - Km 3 Cabanas - Leiao (TagusPark) 2781 OEIRAS CODEX Ver en el mapa Coste total Sin datos