The aim of this research is to develop a new selective secondary cooling technique for beam blank casting. This technique will provide a more homogeneous temperature field in order to avoid inner and surface defects. The solidification and the cooling process will be investigated mainly by numerical simulation, taking into account the different casting parameters (steel grade, extraction rate, cooling conditions, etc.). Prototype equipment will be designed and built. Cold tests will first be performed in the laboratory in order to define the optimum geometry of the cooling boxes. Hot tests will be then performed on a beam blank continuous caster.