Skip to main content
European Commission logo print header
Contenu archivé le 2022-11-21

Blowhole prevention by optimal feeding systems

Objectif

In continuous casting the formation of blowholes presents a serious problem. Blowholes find their origin in the supply system from tundish to mould where argon is injected for the purpose of shrouding and as a means to prevent clogging. It is proposed to overcome the problem of blowholes by reducing the amount of argon injected into the feeding system. This implies that a new supply system should be developed to overcome clogging problems by combining the following items:
- a new collector nozzle;
- a new type SEN (submerged entry nozzle);
- a new flow regulating system;
- a new gas injection system.

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

BRITISH STEEL, TEESSIDE TECHNOLOGY CENTRE
Contribution de l’UE
Aucune donnée
Adresse
Eston Road - P.O.Box 11 Grangetown
TS6 6UB MIDDLESBROUGH
Royaume-Uni

Voir sur la carte

Coût total
Aucune donnée