Deliverables
A report containing details of the power consumption of the vessel during dynamic positioning mode.
A report containing details for the commissioning of the initial testing of the fuel cell system and power electronics container at VTT.
A development and characterisation report for the hydrogen ejectors.
A report containing detailed drawings and description of 10 ft container/containers including a fuel cell system, control system and power electronics needed for the durability testing in Äetsä industry site.
Annual data reporting according to template questionnaires related to the nature of the project
A characterisation report for the commercial humidifiers including the effect of salt.
A report containing summary of initial event and organising of the governing board.
A report to review regulations, codes and standards related with hydrogen and fuel cells in the marine sector and an action plan.
A report including the hydrogen storage system layout with possible alternatives for the storage system components
A characterisation report for the salt particle filter and particle sensor solution. A recommendation for the solution to be used in FC systems in research vessel is given.
A report containing details of the business analysis tool design and use
A report to assess the benefits of using hydrogen as a fuel instead of diesel for vessel electricity production in a selected research vessel.
A report including description of different alternatives for fuel cell hybrid based powertrain systems in Aranda, including details of the selected concept.
A preliminary assessment of safety aspects of installing the fuel cell system and hydrogen storage containers to the research vessel taking into account the relevant regulations, codes and standards.
A report containing summary of workshop 1 including feedback from the participants.
A report including the description of higher level control for the management of fuel cells and energy storage system (batteries).
An interim report containing compiled communications and activities with relevant standard drafting organisations, project advisory board, institutions and regulatory bodies
A report including the drawings and components for the hydrogen storage system to be installed in rsearch vessel Aranda.
Report for the 1st project year (months 1-12) results
Report of kick-off meeting
A report on business analysis conducted for industry stakeholders during last industry event. The report will contain feedback from industry stakeholders so that the most promising applications sub sectors and locations for future demonstrations of hydrogen fuel cells in marine and harbour applications can be identified.
Annual data reporting according to template questionnaires related to the nature of the project
Annual data reporting according to template questionnaires related to the nature of the project
Annual data reporting according to template questionnaires related to the nature of the project
The project public website is published and operational.
Searching for OpenAIRE data...