Deliverables

Enterprise Service Bus specifications

(Related to T3.1) Report on the technical specifications needed to build the Enterprise Service Bus

Report on Requirement and Prosumer Analysis with installation project documentation - Hinnoya

Related to T71 Output of this analysis will be installation project documentation which will be used in the deployment phase of the project

Report on Project Networking

Related to T15 Summary of all the networking activities done during the project

Evaluation & Analysis Report

Related to T64 Definition of the methods and indicators that will be used for assessment of the results of implementation of GIFT systems at demonstration locations

Data analysis report for Hinnoya island cluster demonstration

Related to T72 Identification and analysis of all the appropriate data that will be collected and handled during the exploitation of the system implemented

Technological scenarios and recommendations

Related to T23 Recommendations following the assessments of longterm energyelectricity pathways of the selected islands in order to implement the solutions developed in next WPs at the right scales for the best sustainability

Impact analysis and optimisation recommendations for similar islands to Hinnoya island cluster

Related to T73 Impact analysis of the system on its environment and optimisation recommendations for similar islands thanks to multiobjective iterative optimisation tool for decision making

Scalability and Replicability Analysis

Related to T93 Report on replicability and scalability analysis based on simulation results

Energy profiling of follower islands

Related to T91 Specification of the follower islands Energy profiles thanks to the collection of data in order to assess the replicability of the demonstration solutions

Report on Requirement and Prosumer Analysis with installation project documentation - Procida

Related to T81 Output of this analysis will be installation project documentation which will be used in the deployment phase of the project

Life cycle cost and carbon for different scenarios

(Related to T3.4) Life cycle carbon and cost for different solutions of energy supply system for different boundaries (spatial, temporal and technical)

Contribution to the WG of BRIDGE for cooperation between Smart Grids projects - end-of-project report

Related to T104 Final contribution of GIFT to the BRIDGE initiative by sharing specific issues and learnings related to the energy systems in geographical islands

Requirements relative to the demonstrators

(Related to T2.1) Techno-economical requirements and legislation for the implementation of the solutions in the demonstration sites

Contribution to the WG of BRIDGE for cooperation between Smart Grids projects - mid-term report

Related to T104 Midterm contribution of GIFT to the BRIDGE initiative by sharing specific issues and learnings related to the energy systems in geographical islands

Methodology for assessment of integrated system

Related to T62 Basement of the process to verify proper operation of integrated system

Report on solution deployment in Hinnoya island cluster

Related to T71 Report on solution deployment and effectiveness of the work in the demonstration site of Hinnoya island cluster

Regulatory, socio-economic and technical recommendations for sustainable solutions

Related to T94 Regulatory socioeconomic and technical recommendations for sustainable solutions to ensure a good replicability of GIFT solutions

Dissemination and Communication strategy

(Related to T10.2) Elaboration of a strategy that includes the definition of specific target groups, the appropriate medium to disseminate to these groups, the final goal of the dissemination activities, the timeline of dissemination, etc

Report on component tests

Related to T61 Report on the tests executed at RDN laboratory which is equipped with hardware and software for open and closedloop testing

Data analysis report for Procida demonstration

Related to T82 Identification and analysis of all the appropriate data that will be collected and handled during the exploitation of the system implemented

Use-cases, architecture definition and KPIs definition

(Related to T2.1) Definition of the use-cases, the resulting requirements and the architecture of the demonstrators, using the SGAM (Smart Grid Architecture Model). For each use-case the relevant and specific Key Performance Indicators (KPI) to be monitored during the project to assess the technical and economic performances of the demonstrated solution will also be defined.

Report on solution deployment in Procida

Related to T81 Report on solution deployment and effectiveness of the work in the demonstration site of Procida

Design requirements for replication and deployment of the full-scale demonstration solutions

Related to T94 Technical and design requirements for replication and deployment of the fullscale demonstration solutions

Visualisation software specifications

(Related to T3.5) Different visualisation approaches will be assessed and the most appealing with regards to the particular KPIs of the project will be selected and detailed in this report

Impact analysis and optimisation recommendations for similar islands to Procida

Related to T83 Impact analysis of the system on its environment and optimisation recommendations for similar islands thanks to multiobjective iterative optimisation tool for decision making

Website

(Related to T10.1) Website with specific sections that will all be available in English

Publications

The Multi-Facets of Increasing the Renewable Energy Integration in Power Systems

Author(s): Giulia Grazioli, Sophie Chlela, Sandrine Selosse, Nadia Maïzi
Published in: Energies, Issue 2022, 15 (18), 2022, Page(s) pp.6795, ISSN 1996-1073
Publisher: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en15186795

Assessment of the impacts of different policy instruments on achieving the deep decarbonization targets of island energy systems in Norway – The case of Hinnøya

Author(s): WenjiZhou, Dejene AssefaHagos, SverreStikbakke, LizhenHuang, XuCheng, ErlingOnstein
Published in: Energy, Issue Volume 246, 2022, ISSN 0360-5442
Publisher: Pergamon Press Ltd.
DOI: 10.1016/j.energy.2022.123249

Article in a journal Pathways to decarbonization of European islands: ensuring the integration of high renewable energy and power system flexibility

Author(s): Sophie Chlela, Sandrine Selosse, Nadia Maïzi
Published in: IAEE Energy Forum, Issue 2022, 1st Quarter 2022, 2022, Page(s) pp.16-19, ISSN 1944-3188
Publisher: IAEE Energy Forum

Reversible solid oxide cells applications to the building sector

Author(s): Mario Lamagna, Daniele Groppi, Benedetto Nastasi
Published in: International Journal of Hydrogen Energy, 2023, ISSN 0360-3199
Publisher: Pergamon Press Ltd.
DOI: 10.1016/j.ijhydene.2023.03.387

Investigating alternative power supply solutions under long term uncertainty for offgrid-offshore fish farm: The case of hinnøya island, norway.

Author(s): Dejene Assefa Hagos, Yongping Liu, Lizhen Huang
Published in: Smart Energy, 2022, ISSN 2666-9552
Publisher: 2666-9552
DOI: 10.1016/j.segy.2022.100078

SOLVING ISSUES OF THE DISTRIBUTION NETWORK OF HARSTAD (NORWAY) IN REAL TIME USING MACHINE LEARNING-BASED OBSERVABILITY TO PLACE FLEXIBILITY ORDERS

Author(s): Benoit GROSJEAN, Luc RICHAUD, Nuno PINHO DA SILVA, Ângelo CASALEIRO, Gregor ČERNE
Published in: CIRED 2023, 2023
Publisher: IET

How To Ensure Interoperability In Demand Response Systems: The Examples Of The European Projects H2020 GIFT And MAESHA

Author(s): Sebilleau, Dune; Farré, Marjolaine; Genest, Olivier
Published in: CIRED 2023 Rome Workshop, Issue Paper n° 10695, 2023
Publisher: CIRED

Implementation of a local flexibility market for solving network issues

Author(s): Luc Richaud, Zoran Marinšek, Isidoros Kokos, Nuno Pinho da Silva, Philippe Deschamps, Michel Clemence, Clémentine Benoit
Published in: CIRED 2020 Berlin Workshop (CIRED 2020), Issue Paper 367 – Reported to the 22nd and 23rd of September, 2020, Page(s) Theme 3: Flexibility Platforms and the Role of future DSO's, ISSN 2515-0855
Publisher: IET
DOI: 10.1049/oap-cired.2021.0227

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available