European Technology and Innovation Platform Bioenergy - Support of Renewable Fuels and Advanced Bioenergy Stakeholders 2

Deliverables

Mid-term wiki collaboration platform activity summary

Brief information on further developed state-of-the-art decision support wiki platform including content for up to four state-of-the-art overviews will be presented by RISE at mid-term.

Joint mid-term report about ETIP-Bioenergy support activities

FNR supported by BE2020 will collect inputs made at SC and CG level (Task 2.1), WG level (Task 2.2) and through workshops organized in Task 4.2 and 4.3 and at larger stakeholders’ meetings (Task 4.4) and provide these inputs to DG-RTD etc. on a regular basis. Work will result in updated versions of the current policy documents and reported in D2.1 at project mid-term.

Data Management Plan

The overall framework of the data management will be formulated in a Data Management Plan (D1.2).

Report on 1. Stakeholder Plenary Meeting

One SPM will be organized at project mid-term. The meetings will be held in Brussels. Key highlights will be summarized in a short and visually attractive report.

Basic supporting materials

The following basic materials will be provided (D5.4): • a project brochure (available both as printed – at least 2.000 copies - and digital version) for letting wide public know about the project will be conceived; • project roll-up to be used at project workshops, conferences and events organized or co-organized by the consortium; • specific templates (i.e. a PowerPoint for dissemination events, a template for reports, a poster template) will be designed according to the ETIP Bioenergy Platform visual identity. • An ETIP Bioenergy Platform media kit will be prepared to ease the communication with media partners during the project. It will include, in a short and easy-to-read way, useful information on ETIP-B-SABS 2 project for media partners, such as: mission; available digital tools, contents and interactions; events – no. of speakers and participants; newsletters and press releases; stakeholders engagement activities, etc. It will be updated in its main figures (MS5.1).

Mid-term addition of new fact sheets

6 new fact sheets will be produced by the project (D3.2; D3.4). ETIP-B-SABS 2 will also check fact sheets published by others like IEA Bioenergy, f3 etc. and provide links through the ETIP Bioenergy website. BE2020 will lead this task supported by RISE, FNR, ETA and INCE. BE2020 and RISE will work on technological fact sheets, and FNR, ETA and INCE will support this activity and work on the country or regional fact sheets.