Deliverables
Test strategy and quality control procedures
Pre-installation of a reduced scope of the WEC system
Pre-installation to include 2 (two) energy modules, for testing and adjustment of the function, abilities and process parameters of the individual and combined system elements, prior to installing the remaining 22 energy modules of the final 24.
Intellectual Property Rights
Application/Publication number:
Wavepiston
018327287
Date:
2020-10-28
Applicant(s):
WAVEPISTON AS
Application/Publication number:
Wavepiston
018327287
Date:
2020-10-28
Applicant(s):
WAVEPISTON AS
Application/Publication number:
Wavepiston
018327287
Date:
2020-10-28
Applicant(s):
WAVEPISTON AS
Application/Publication number:
11
159337
Date:
2009-09-18
Applicant(s):
WAVEPISTON AS
Application/Publication number:
11
159337
Date:
2009-09-18
Applicant(s):
WAVEPISTON AS
Application/Publication number:
11
159337
Date:
2009-09-18
Applicant(s):
WAVEPISTON AS
Application/Publication number:
17
835998
Date:
2017-12-13
Applicant(s):
WAVEPISTON AS
Application/Publication number:
PCT/DK2017/
050430
Date:
2016-12-13
Applicant(s):
WAVEPISTON AS
Application/Publication number:
11
159337
Date:
2009-09-18
Applicant(s):
WAVEPISTON AS
Application/Publication number:
17
835998
Date:
2017-12-13
Applicant(s):
WAVEPISTON AS
Application/Publication number:
17
835998
Date:
2017-12-13
Applicant(s):
WAVEPISTON AS
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available