IntegrAted SolutioNs for the DecarbOnization and Smartification of Islands

Livrables

IANOS collaboration with other initiatives (T9.4)

First report on the IANOS collaboration with other initiatives of Task 94 This deliverable will report on the collaboration between the consortium members and other projects belonging in LEC initiatives active at EU level

Lighthouse Islands Replication and Scalability Plan (T9.1)

First Lighthouse Islands Replication and Scalability Plan of Task 91 This deliverable will summarise the knowledge and tools gathered during WP5 WP6 and WP3 covering regulatory technical economic and environmental aspects for the upscaling of the UCs

Ameland UCs preliminary iVPP integration tests (T5.1)

Report on the Ameland UCs preliminary iVPP integration tests of Task 51 This deliverable will provide the results of the preliminary test of the iVPP decision making intelligence by connecting existing assets in Ameland and examining their response based on the functional requirements

IANOS collaboration with other initiatives (T9.4)_v2

Second report on the IANOS collaboration with other initiatives of Task 94 This deliverable will report on the collaboration between the consortium members and other projects belonging in LEC initiatives active at EU level

Terceira system integration report (T6.3)

First version of the Terceira system integration report of Task 63 This deliverable will detail the integration of all foreseen systems and technologies in Terceira

Terceira UCs preliminary iVPP integration tests (T6.1)

Report on the Terceira UCs preliminary iVPP integration tests of Task 61 This deliverable will provide the results of the preliminary test of the iVPP decision making intelligence by connecting existing assets in Terceira and examining their response based on the functional requirements

Island Energy Community Engagement Toolbox with best practices inventory (T8.1)

Report on the Island Energy Community Engagement Toolbox with best practices inventory of Task 81 This deliverable will develop a community engagement strategy to monitor an increase the engagement in the different UCs

Ameland UCs Deployment Plan report (T5.2)

Report on the Ameland UCs Deployment Plan of Task 52 This deliverable will coordinate and facilitate the implementation of all systems and technologies on the island orchestrated by the iVPP

Initial TRL assessment and development of Ameland technologies roadmaps (T5.1)

First TRL assessment and development of Ameland technologies roadmaps of Task 51 This deliverable will assess the current TRL and set out the necessary steps to increase the TRL of individual components for the Ameland pilot

IANOS Exploitation Plan (PUDF and identification of project KERs) (T10.4)_v2

Second IANOS Exploitation Plan Task 104 This deliverable will detail exploitation status and perspectives at partners and Consortiums level

Quality Assurance, Risk Assessment and Contingency Plans (T1.3)_v2

First update of the Quality Assurance Risk Assessment and Contingency Plans corresponding to Task 13 This deliverable will set the appropriate mechanisms to identify anticipate and mitigate potential risks of the projects internal quality through the definition of a specific risk analysis and assessment methodology

Report on Islands requirements engineering and UCs definitions (T2.1)

Report on Islands requirements engineering and UCs definitions of Task 21 This deliverable will describe the UCs according to the IEC62559 standard and will include the technical specifications for all equipment and systems to be deployed in WP5 and WP6

Ameland system integration report (T5.3)

First version of the Ameland system integration report of Task 53 This deliverable will detail the integration of all foreseen systems and technologies in Ameland

IANOS System Architecture (T2.5)_v3

Last update of the IANOS System Architecture report of Task 25 This deliverable will specify the data flows between the multiple IANOS ICT and fieldlevel subsystems services and applications

IANOS KPIs and evaluation metrics report (T2.3)_v2

First update of the IANOS KPIs and evaluation metrics report of Task 23 This deliverable will define representative metrics and indexes for characterizing both the LH and FIs regarding their status before and after the demonstration

Report on Dissemination Actions (T10.3)

First Report on Dissemination Actions Task 103 This task will provide an overview of the actions through which IANOS information and knowledge will be disseminated

Ethics and Cyber Security Management report (T1.4)

First version of the Ethics and Cyber Security Management report corresponding to Task 14 This deliverable will define the set of cyber security guidelines to ensure the consumers privacy through the anonymization and aggregation of their data

Report on Islands requirements engineering and UCs definitions (T2.1)_v2

First update on the report on Islands requirements engineering and UCs definitions of Task 21 This deliverable will describe the UCs according to the IEC62559 standard and will include the technical specifications for all equipment and systems to be deployed in WP5 and WP6

IANOS Islands Decarbonisation Master Plan (T2.4)_v2

First update of the IANOS Islands Decarbonisation Master Plan of Task 24 This deliverable will illustrate the different solutions for decarbonisation their specifications and requirements and provide information on installation performance reliability and costs to facilitate the replication of IANOS solutions

IANOS Islands Decarbonisation Master Plan (T2.4)

First version of the IANOS Islands Decarbonisation Master Plan of Task 24 This deliverable will illustrate the different solutions for decarbonisation their specifications and requirements and provide information on installation performance reliability and costs to facilitate the replication of IANOS solutions

IANOS System Architecture (T2.5)

First version of the IANOS System Architecture report of Task 25 This deliverable will specify the data flows between the multiple IANOS ICT and fieldlevel subsystems services and applications

Terceira UCs Deployment Plan report (T6.2)

Report on the Terceira UCs Deployment Plan of Task 62 This deliverable will coordinate and facilitate the implementation of all systems and technologies on the island orchestrated by the iVPP

Report on regulatory/legal and financial aspects (T2.2)_v2

First update on the report on regulatorylegal and financial aspects of Task 22 This deliverable will map the local regulations grid codes and financial aspects that are relevant to the decarbonization of the LHIs It will also produce some recommendations to complement the ongoing European harmonisation activities

Report on Islands requirements engineering and UCs definitions (T2.1)_v3

Last update on the report on Islands requirements engineering and UCs definitions of Task 21 This deliverable will describe the UCs according to the IEC62559 standard and will include the technical specifications for all equipment and systems to be deployed in WP5 and WP6

Report on regulatory/legal and financial aspects (T2.2)

Report on regulatorylegal and financial aspects of Task 22 This deliverable will map the local regulations grid codes and financial aspects that are relevant to the decarbonization of the LHIs It will also produce some recommendations to complement the ongoing European harmonisation activities

IANOS KPIs and evaluation metrics report (T2.3)_v3

Last update of the IANOS KPIs and evaluation metrics report of Task 23 This deliverable will define representative metrics and indexes for characterizing both the LH and FIs regarding their status before and after the demonstration

IANOS System Architecture (T2.5)_v2

First update of the IANOS System Architecture report of Task 25 This deliverable will specify the data flows between the multiple IANOS ICT and fieldlevel subsystems services and applications

IANOS KPIs and evaluation metrics report (T2.3)

First version of the IANOS KPIs and evaluation metrics report of Task 23 This deliverable will define representative metrics and indexes for characterizing both the LH and FIs regarding their status before and after the demonstration

Capacity building manual and progress report (T8.3)_v2

Second Capacity building manual and progress report of Task 83 This deliverable will report on the progress of the training sessions organised on both LH and FIs

Initial TRL assessment and development of Terceira technologies roadmaps (T6.1)

First TRL assessment and development of Terceira technologies roadmaps of Task 61 This deliverable will assess the current TRL and set out the necessary steps to increase the TRL of individual components for the Terceira pilot

IANOS Exploitation Plan (PUDF and identification of project KERs) (T10.4)

First IANOS Exploitation Plan Task 104 This deliverable will detail exploitation status and perspectives at partners and Consortiums level

IANOS Replication across EU and cooperation with relevant project/initiatives (T9.3)

First report on the IANOS Replication across EU and cooperation with relevant projectinitiatives of Task 93 This deliverable will identify additional potential replication capacities on EU islands

Establishment of Engagement Platform for Geographical Islands (T8.2)

Establishment of Engagement Platform for Geographical Islands of Task 82 This deliverable will support the decarbonization plan in FIs through an information hub that provides an overview of best practices for participation of community and citizens engagement

Ethics and Cyber Security Management report (T1.4)_v2

First update of the Ethics and Cyber Security Management report corresponding to Task 14 This deliverable will define the set of cyber security guidelines to ensure the consumers privacy through the anonymization and aggregation of their data

Quality Assurance, Risk Assessment and Contingency Plans (T1.3)

First version of the Quality Assurance Risk Assessment and Contingency Plans corresponding to Task 13 This deliverable will set the appropriate mechanisms to identify anticipate and mitigate potential risks of the projects internal quality through the definition of a specific risk analysis and assessment methodology

Report on regulatory/legal and financial aspects (T2.2)_v3

Last update on the report on regulatorylegal and financial aspects of Task 22 This deliverable will map the local regulations grid codes and financial aspects that are relevant to the decarbonization of the LHIs It will also produce some recommendations to complement the ongoing European harmonisation activities

IANOS Islands Decarbonisation Master Plan (T2.4)_v3

Last update of the IANOS Islands Decarbonisation Master Plan of Task 24 This deliverable will illustrate the different solutions for decarbonisation their specifications and requirements and provide information on installation performance reliability and costs to facilitate the replication of IANOS solutions

IANOS C&D Plan (T10.1)

Report on the IANOS Communication Dissemination Planning of Task 101 This deliverable will define project overall strategy target groups channels responsibilities and timelines for both intraconsortium and external communication

Terceira system commissioning report (T6.3)

Terceira system commissioning report of Task 63 This deliverable will detail the commissioning of all foreseen systems and technologies in Terceira

Fellow Islands Replication and Scalability Plan (T9.2)

First Fellow Islands Replication and Scalability Plan of Task 92 This deliverable will summarise the knowledge and tools gathered during WP3 and the FI replicated scenario covering regulatory technical economic and environmental aspects for the upscaling of the UCs

Data Management Plan (T1.4)_v2

First update of the Data Management Plan referring to Task 14 This deliverable will describe how the data will managed and stored throughout the IANOS Project

Data Management Plan (T1.4)_v3

Second update of the Data Management Plan referring to Task 14 This deliverable will describe how the data will managed and stored throughout the IANOS Project

Data Management Plan (T1.4)

First version of the Data Management Plan referring to Task 14 This deliverable will describe how the data will managed and stored throughout the IANOS Project

iVPP Virtual energy Console (T4.6)

First version of the iVPP Virtual energy Console of Task 4.6. This deliverable will allow for monitoring the whole VPP operation through the access of different datasets inline with IANOS KPIs.

iVPP Aggregation and intelligent Segmentation (T4.3)

First version of the iVPP Aggregation and intelligent Segmentation tool of Task 43 This tool will allow the aggregation of heterogeneous assets into clusters that answer a clients technical and economic needs

Development of LCA/LCC tool for Transition Support (T3.1)_v2

Delivery of the second version of the LCA/LCC tool for Transition Support corresponding to Task 3.1. This tool will calculate the environmental gains and associated cost savings, from the implementation of RES based and grid counter-congestion strategies at a user and community level.

Terceira UCs equipment engineering and laboratorial validation (T6.1)

Laboratorial validation of the Terceira UCs equipment of Task 6.1. This deliverable will validate all of Terceira's pilot components before their deployment and demonstration.

Equity crowdfunding tool for Community-driven Investments (T3.2)_v2

Delivery of the second version of the platform for Equity crowdfunding for Community-driven Investments of Task 3.2. This platform will enable fractional ownership of RE assets supporting projects’ fundraising and transactions via normal FIAT currency or tokenized energy.

IANOS Website and dissemination material (T10.2)_v2

Update on the IANOS Website Task 102

Development of LCA/LCC tool for Transition Support (T3.1)

Delivery of the first version of the LCALCC tool for Transition Support corresponding to Task 31 This tool will calculate the environmental gains and associated cost savings from the implementation of RES based and grid countercongestion strategies at a user and community level

Development of Energy Planning & Transition Decision Support Toolset (T3.3)_v2

Delivery of the second version of the Energy Planning & Transition Decision Support Toolset of Task 3.3. This tool will perform an holistic evaluation the overall benefits expected from clean energy/smart grid interventions based on the viewpoint from each stakeholder.

The iVPP Centralized Dispatcher (T4.4)

First version of the The iVPP Centralized Dispatcher tool of Task 44 This deliverable will allow to deliver the optimal dispatch plan for both selfconsumption and grid services provision and dayahead to sec level timeframes

Decision Support Toolset Pre-Validation/Assessment of LH & Fellow Islands Plans (T3.4)

Delivery of the first version of the Decision Support Toolset for PreValidation of LH Fellow Islands Plans of Task 34 This deliverable aims at pre validate the decision support toolset by finetuning its calculations and functionalities

Equity crowdfunding tool for Community-driven Investments (T3.2)

Delivery of the first version of the platform for Equity crowdfunding for Communitydriven Investments of Task 32 This platform will enable fractional ownership of RE assets supporting projects fundraising and transactions via normal FIAT currency or tokenized energy

iVPP Forecasting Engine (T4.2)

First version of the iVPP Forecasting Engine of Task 42 This deliverable will feed the IANOS iVPP forecasting module allowing to forecast both demand and generation using data and model driven techniques

Development of Energy Planning & Transition Decision Support Toolset (T3.3)

Delivery of the first version of the Energy Planning Transition Decision Support Toolset of Task 33 This tool will perform an holistic evaluation the overall benefits expected from clean energysmart grid interventions based on the viewpoint from each stakeholder

IANOS Website and dissemination material (T10.2)

Setup of the IANOS website Task 102

iVPP secure data monitoring and governance (T4.1)

Delivery of the first version of the API allowing the iVPP secure data monitoring and governance of Task 41 This deliverable will consist of the secure APIs and communication pipelines ESB allowing to send the required information inbetween VPP with field devices and VPP with external systems

iVPP P2P transactive energy framework (T4.5)

First version of the iVPP P2P transactive energy framework tool of Task 45 This deliverable will support the energy creditsdebits exchange within a community through the development of smart contracts

Decision Support Toolset Pre-Validation/Assessment of LH & Fellow Islands Plans (T3.4)_v2

Delivery of the second version of the Decision Support Toolset for Pre-Validation of LH & Fellow Islands Plans of Task 3.4. This deliverable aims at pre validate the decision support toolset by finetuning its calculations and functionalities.

Ameland UCs equipment engineering and laboratorial validation (T5.1)

Laboratorial validation of the Ameland UCs equipment of Task 5.1. This deliverable will validate all of Ameland's pilot components before their deployment and demonstration.

Publications

White paper on replication

Auteurs: Partners involved in the folowing EU funded projects dealing with islands decarbonization: GIFT H2020, IANOS H2020, INSULAE H2020, ISLANDER H2020, MAESHA H2020, NESOI, REACT H2020, ROBINSON H2020, SOCLIMPACT H2020, VPP4ISLANDS H2020.
Publié dans: 2023
Éditeur: ROBINSON H2020 project website

Integrated Methodology for Community-Oriented Energy Investments: Architecture, Implementation, and Assessment for the Case of Nisyros Island

Auteurs: Charalampos Papadopoulos 1, Athanasios Bachoumis 2,3 Niki Skopetou 1 Costas Mylonas 2, Nikolaos Tagkoulis 1, Petros Iliadis 1, Ioannis Mamounakis 1 Nikolaos Nikolopoulos 1 1 - Centre for Research and Technology Hellas/Chemical Process and Energy Resources Institute (CERTH/CPERI), Egialeias 52, 15125 Marousi, Greece 2 - Ubitech Energy, Koningin Astridlaan 59b, 1780 Wemmel, Belgium 3 - Department
Publié dans: 'Energies' MDPI journal, 2023, ISSN 1996-1073
Éditeur: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en16196775

Integrated solutions to decarbonise and improve resilience of power and energy systems in geographical islands

Auteurs: Author(s): A. Carvalho 1 ; E. Rodrigues 1 ; C. Martins 2 Affiliations: 1: EDP NEW R&D , Portugal ; 2: Eletricidade dos Açores , Portugal.
Publié dans: 27th International Conference on Electricity Distribution (CIRED 2023), 2023 p. 3684 – 3688, 2023
Éditeur: 27th International Conference on Electricity Distribution (CIRED 2023)
DOI: 10.1049/icp.2023.0756

IANOS: Innovative energy storage solutions for the decarbonization of geographical islands

Auteurs: Ana Gonçalves de Carvalho Carlos José Martins Johan Boekema Erwin de Boer Jacob Dijkstra Napoleon Bezas Charalampos Papadopoulos Niki Skopetou Petros Iliadis Mohammed Al-Saadi Samuele Da Ronch
Publié dans: SUPHER’ 23 : Publication and participation to a conference, 2023
Éditeur: SUPHER’ 23 : Publication and participation to a conference