Skip to main content

New blow-out preventer/wireline stuffing box for the oil and gas industry

Objective



Numerous well control problems occurring over several decades have been studied to determine the causes. By learning from these past well control mistakes, we can help prevent future blowouts. Currently many leakages and accidents occur at the boreholes drilled in the production of hydrocarbons. These have disastrous consequences for both the environment and the personnel involved. This new device is proposed as a solution to assist in the safe control and management of wellheads. The application of such a device within this highly pressurised environment, will prevent the escape of fluids, rod and wire rope whilst permitting drilling operations to be continued and adjusted accordingly. Ultimately, this revolutionary system will ensure the elimination of blow-outs. It offers not only greater safety and more control, but also significant cost and damage reduction for both the offshore industry and the environment.

Funding Scheme

EAW - Exploratory awards

Coordinator

BROOKMEX Limited
Address
Welsh Street
NP6 5SL Chepstow - Gwent
United Kingdom

Participants (1)

Arcon International Resources Plc
Ireland
Address

Dublin 4