INDUSTRIAL DEMONSTRATION PLANT WITH FLUIDIZED BED COMBUSTION OF HIGH SULPHUR AND ASH CONTENT COAL [PHASE 2]

Objective

Definition, feedstock characterization and engineering of a circulating fluidized bed boiler with a capacity of 35 T/H of superheated steam burning low calorific value coal (3300 kcal/kg) with a high sulphur content (4-6 %) and high ash content (35-45 %) from Aragon and Catalunia.
Objective : to develop a modular, industrial circulating F. B. C. boiler.
This is the second of two contracts, the first being CS/312/86 limited to the definition, feedstock characterisation and engineering of this boiler. This engineering study has been completed and lead to the construction of a unit to demonstrate the capability of this technology to respond to the requirements of availability, reliability, environmental impact and efficiency that will enable it to be marketed in the future.
The Demonstration Plant can be divided in the following components and/or main equipment for a better comprehension :
- Boiler
. Furnace
. Cyclone
. Heat Recovery Area (HRA)
- Feeding System (coal and limestone)
- Ash Handling System
- Gas Cleaning System
- Control System
The boiler is of the natural circulation, balanced draft type, for outdoors installation, and comprises basically three parts :
. Furnace
. Cyclone
. HRA
The furnace, the cyclone and the walls of the upper part of HRA, are made of waterwalls, constituted by welded membrane walls.
The furnace is totally enclosed by waterwalls; in its lower part there is the primary air plenum chamber and the grid for proper air distribution is located right under the bed.
The drum is located directly over the furnace, in the upper part of the boiler. Its mission, as in all the natural circulation boilers, is to assure the absence of humidity and a lowconcentration of salt disolved in the steam to the turbine, as well as to allow the correct circulation of water/steam in the boiler.
The cyclone is an integral part of the boiler, being formed by water cooled walls, with two annular headers at the top and the bottom, being connected directly to the furnace and to the HRA. The boiler control and safety system assures the safe boiler operation, the purge procedures, lighting off and sequential trip procedures. The analogic control system governs the coal and limestone feed, the waste material removal, the air flow, the furnace pressure and the feed water flow.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.

This project has not yet been classified with EuroSciVoc.
Be the first one to suggest relevant scientific fields and help us improve our classification service

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

DEM - Demonstration contracts

Coordinator

AGRUPACION DE EMPRESAS SERCOFLUID
EU contribution
No data
Address
PRINCIPE DE VERGARA, 74
28006 Madrid
Spain

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data
My booklet 0 0