HYDRO-ELECTRICITY FROM THE DRINKING WATER SUPPLY SYSTEM OF LA MURE/FRANCE

Objective

Recovery of hydro-electric power from an existing drinking-water supply pipeline (LA MURE FRANCE) for sale to Electricite de France.

The aim of the project is to exploit the hydraulic energy of an existing drinking water conduit supplying a small community. With a constant discharge capacity throughout the year of 75 L/S and a net head of 143 m, max. output of the hydropower plant is 86 kW. The installation consists of a single jet Pelton turbine for constant flow directly coupled with an asynchronous generator. Operation of plant would be fully automatic.

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Data not available

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

DEM - Demonstration contracts

Coordinator

MAIRIE DE LA MURE
EU contribution
No data
Address
HOTEL DE VILLE
38350 LA MURE
France

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data