ARCHITECTURALLY INTEGRATED, GRID-CONNECTED PHOTOVOLTAIC ROOF LIGHTS FOR THE JAGUAR/ESCORT ENGINE PLANT OF FORD UK

Objective

The aim of the project is to demonstrate 26 architecturally integrated PV and natural lighting on the Ford manufacturing plant located in Bridgend (South Wales), 97 kWp of power generated for the electrical system within the manufacturing plant.
This will be the first example of a large scale PV system to be integrated into a manufacturing environment in Europe, and the largest PV system in the UK to date. It will stimulate continued interest in this technology and provide high experience in developing techniques for future integration into buildings.
The Ford Motor Company have a corporate manufacturing environmental strategy to improve social acceptability of their manufacturing plants and this project will act as a catalyst for future projects in their endeavours to design a Factory for the Future.
In addition to generating 105,000 kWhrs of emission free electricity per year, saving at least 3150 tonnes of carbon dioxide in the anticipated lifetime, the roof lights will also provide natural lighting to the work areas below, improving the benefits of the overall system.
Large area laminates will be used incorporating the highest efficiency solar cells currently available and purpose-designed plug-in DC connections to minimise the installation tome. A separate inverter will be used for each string of laminates so the DC connections are kept to a minimum and the majority of cabling is AC. Wiring will thus be familiar to electricians who have not had previous experience with PV systems.
The roof lights will provide natural day-lighting to the assembly area below, improving the working environment, enhancing productivity and reducing the electrical load of the plant.
Within this project it is also proposed to investigate the effects on system performance of connecting multiple inverters into the 3-phase electrical supply used within the manufacturing plant.
ENVIRONMENTAL IMPACT
Reduced emissions from displaced electricity generators from PV and natural light and heating.

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

DEM - Demonstration contracts

Coordinator

FORD MOTOR COMPANY
EU contribution
No data
Address
SPESSART STRASSE
50725 Köln
Germany

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data
My booklet 0 0