Deliverables
Report on the subsystem tests, report on the commissioning of two accordingly equipped locomotives and report on the demonstration (The concrete scale and testing procedures will be decided within the project, but are limited to a set of runs needed to demonstrate in a protected environment (multiple drivers, extra safety expedients) the operability of the train)
Searching for OpenAIRE data...
Publications
Author(s): Norbert Kahl, Niels Weigelt, Andrea Mazzone
Published in: Proceedings of 7th Transport Research Arena TRA 2018, A pril 16-19, 2018, Vienna, Austr, 2018
Publisher: Zenodo
DOI: 10.5281/zenodo.1435596
Author(s): Andrea Mazzone, Mathias Schönbacher, Xabier Larrea;
Published in: Proceedings of 7th Transport Research Arena TRA 2018, April 16 - 19, 2018, Vienna, Austria, 2018
Publisher: Zenedo
DOI: 10.5281/zenodo.1441109