Deliverables Documents, reports (9) Socio-economic impact analysis, legal analysis, and freight-specific operational requirement specification ATO over ETCS The output will be a report on the socio economic Situation, the legal barriers in Europe as well as the funtional requirements for ATO over ETCS, with the resulting deliverable D1.1. Description of automation/optimisation requirements and capabilities of decision-making processes in marshalling yards and terminals The task will start by classifying the different types of nodes considered in the WP (marshalling yards, terminals) and develop a common understanding and description of operational procedures and rules in these types of local hubs based on the results of previous projects. Situations with one or multiple rail operators in a single hub will be taken into account. Furthermore, a common understanding of decision processes and their optimisation and automation potential in different types of local hubs will be developed and described in a report (D2.1). Final dissemination and communication report: publications in different communication channels, e.g. press release/ newsletter Summary of dissemination and communication activities publications in different communication channels eg press release newsletter Description of business processes of a network management system and the interactions/ interfaces with a Real-time Yard Management System Description of business processes of a network management system and the interactions/ interfaces with a Real-time Yard Management System Analysis of automated brake test for freight trains The focuses is on automation in the nodes of the rail freight system and particularly brake testing requirements in marshalling yards to reduce lead time (D1.3). Final pre-study for an improved methodology for timetable planning including state-of-the-art and future work plan Final pre-study for an improved methodology for timetable planning including state-of-the-art and future work plan Modelling Requirements and Interface Specification to Yard Simulation System Modelling Requirements and Interface Specification to Yard Simulation System Dissemination and communication strategy / Project website and dissemination material The aim of the dissemination strategy is to identify the most efficient ways to guarantee the maximum visibility for the project and an optimal deployment of the project results. The task will identify the means of communication and collaboration and the content of appropriate dissemination tools. The website will be a key communication instrument within the Consortium’s dissemination effort and a key dissemination instrument outside the Consortium. It will be established in alignment with the Joint Undertaking as a European reference point to provide up-to-date, easy and quick access to shared requirements and further information on the project throughout the project period. Description of demonstration scenarios for a Real-time Yard Management System Description of demonstration scenarios for a Real-time Yard Management System Publications Conference proceedings (10) "ARCC / WP2 ""Real-Time Yard Management”" Author(s): DB Cargo Published in: 2016 Publisher: Railcon ARCC Final Event Author(s): DB Cargo Published in: 2021 Publisher: Joint Undertaking Freight ATO in Shift2Rail IP5 Author(s): DB Cargo Published in: 2017 Publisher: Joint Undertaking Rail freight automation in Shift2Rail – Development of prototypes Author(s): Norbert Kahl; Niels Weigelt; Andrea Mazzone Published in: 7th Transport Research Arena TRA 2018, Issue April 16-19, 2018, Vienna, Austria, 2018, Page(s) 1-9 Publisher: TRA 2018 DOI: 10.5281/zenodo.1435596 Collaborative field test of Freight ATO marks Shift2Rail milestone Author(s): Norbert Kahl, Andrea Mazzone, Sascha Seggert Published in: Proceedings of 8th Transport Research Arena TRA 2020, Issue April 27-30, 2020, 2020, Page(s) 1-7 Publisher: TRA 2020 Implementation and challenges of ETCS & ATO on a European scale Author(s): DB Cargo Published in: 2019 Publisher: Smartrail Energy efficiency in ATO train driven or equipped with C-DAS Presentation at SEF2017 Author(s): Hitachi Rail STS Published in: 2017 Publisher: SEF Presentation of ARCC and Freight ATO at Shift2Rail booth and in a Panel session at TRA2018 Author(s): DB Cargo AG, Bombardier Transportation Published in: 2018 Publisher: TRA Maximum Robust Train Path for an Additional Train Inserted in an Existing Railway Timetable Author(s): Ljunggren, Fredrik; Persson, Kristian; Peterson, Anders; Schmidt, Christiane Published in: Proceedings of the 14th International Conference on Advanced Systems in Public Transport, CASPT 2018, Brisbane, Australia, 23-25 July 2018, Issue 30, 2018, Page(s) 1-20 Publisher: Proceedings: 14th International Conference on Advanced Systems in Public Transport and TransitData Real-time Yard Management -First results presented during Logistik Forum 2017 Author(s): DB Cargo & DXC Published in: Logistik Forum 2017, 2017 Publisher: Logistik Forum Other (11) "Participation at InnoTrans 2018 by ARCC members and organization of a ""Mobility Talk Shift2Rail IP5""" Author(s): ARCC Members, Mobility Talk with Carlo Borghini and Thomas Jäger Published in: 2018 Publisher: InnoTrans Analysis and requirement specification ATO over ETCS Author(s): Trafikverket, Hitachi Rail STS Published in: 2018 Publisher: Joint Undertaking Description interactions/interfaces with a Real-time Yard Management System Author(s): Linköping University Published in: 2018 Publisher: Joint Undertaking Collaborative field test of Freight ATO marks Shift2Rail milestone presented at TRA2020 Author(s): DB Cargo AG, Bombardier Transportation, Siemens Mobility GmbH Published in: 2020 Publisher: TRA ARCC and IP5 Mobility Talk at InnoTrans Author(s): Carlo Borghini, Miroslav Obrenovic Published in: InnoTrans 2016, Issue 20.09. - 23.09.2016, 2016 Publisher: InnoTrans ATO successfully tested in Rail Freight Author(s): DB Cargo Published in: 2021 Publisher: Joint Undertaking Development of Functional Requirements for sustainable and attractive European Rail Freight Author(s): KTH Railway Group Published in: 2018 Publisher: Joint Undertaking ARCC – GOA2 Freight Demonstrato Author(s): DB Cargo, Thales, Bombardier, Hitachi Rail STS, Alstom, SBB, AŽD; Siemens Published in: 2021 Publisher: Joint Undertaking Automation Marshalling Yards Author(s): DB Cargo AG Published in: Deliverables in ARCC, Issue 31.08.2017, 2017 Publisher: Funding and Tenders Shift2Rail ATO over ETCS webinar - an Interoperable Journey – from concept to field experience Author(s): Europe's Rail Joint Undertaking Published in: 2021 Publisher: Europe's Rail Joint Undertaking Real-time Yard Management - Objectives & First results presented during Transport logistic fair Author(s): DB Cargo Published in: 2017 Publisher: Transport Logistic Fair Peer reviewed articles (1) Towards a comprehensive model for track allocation and roll-time scheduling at marshallingyards Author(s): Sara Gestrelius, Martin Aronsson, Martin Joborn, Markus Bohlin Published in: Journal of Rail Transport Planning & Management, Issue Volume 7, Issue 3, 2017, Page(s) Pages 157-170, ISSN 2210-9706 Publisher: Elsevier BV DOI: 10.1016/j.jrtpm.2017.06.002 Searching for OpenAIRE data... There was an error trying to search data from OpenAIRE No results available