CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
The output will be a report on the socio economic Situation, the legal barriers in Europe as well as the funtional requirements for ATO over ETCS, with the resulting deliverable D1.1.
Description of automation/optimisation requirements and capabilities of decision-making processes in marshalling yards and terminals (s’ouvre dans une nouvelle fenêtre)The task will start by classifying the different types of nodes considered in the WP (marshalling yards, terminals) and develop a common understanding and description of operational procedures and rules in these types of local hubs based on the results of previous projects. Situations with one or multiple rail operators in a single hub will be taken into account. Furthermore, a common understanding of decision processes and their optimisation and automation potential in different types of local hubs will be developed and described in a report (D2.1).
Final dissemination and communication report: publications in different communication channels, e.g. press release/ newsletter (s’ouvre dans une nouvelle fenêtre)Summary of dissemination and communication activities publications in different communication channels eg press release newsletter
Description of business processes of a network management system and the interactions/ interfaces with a Real-time Yard Management System (s’ouvre dans une nouvelle fenêtre)Analysis of automated brake test for freight trains (s’ouvre dans une nouvelle fenêtre)
The focuses is on automation in the nodes of the rail freight system and particularly brake testing requirements in marshalling yards to reduce lead time (D1.3).
Final pre-study for an improved methodology for timetable planning including state-of-the-art and future work plan (s’ouvre dans une nouvelle fenêtre)Modelling Requirements and Interface Specification to Yard Simulation System (s’ouvre dans une nouvelle fenêtre)
Dissemination and communication strategy / Project website and dissemination material (s’ouvre dans une nouvelle fenêtre)
The aim of the dissemination strategy is to identify the most efficient ways to guarantee the maximum visibility for the project and an optimal deployment of the project results. The task will identify the means of communication and collaboration and the content of appropriate dissemination tools. The website will be a key communication instrument within the Consortium’s dissemination effort and a key dissemination instrument outside the Consortium. It will be established in alignment with the Joint Undertaking as a European reference point to provide up-to-date, easy and quick access to shared requirements and further information on the project throughout the project period.
Description of demonstration scenarios for a Real-time Yard Management System (s’ouvre dans une nouvelle fenêtre)Publications
Auteurs:
Norbert Kahl; Niels Weigelt; Andrea Mazzone
Publié dans:
7th Transport Research Arena TRA 2018, Numéro April 16-19, 2018, Vienna, Austria, 2018, Page(s) 1-9
Éditeur:
TRA 2018
DOI:
10.5281/zenodo.1435596
Auteurs:
Norbert Kahl, Andrea Mazzone, Sascha Seggert
Publié dans:
Proceedings of 8th Transport Research Arena TRA 2020, Numéro April 27-30, 2020, 2020, Page(s) 1-7
Éditeur:
TRA 2020
Auteurs:
Ljunggren, Fredrik; Persson, Kristian; Peterson, Anders; Schmidt, Christiane
Publié dans:
Proceedings of the 14th International Conference on Advanced Systems in Public Transport, CASPT 2018, Brisbane, Australia, 23-25 July 2018, Numéro 30, 2018, Page(s) 1-20
Éditeur:
Proceedings: 14th International Conference on Advanced Systems in Public Transport and TransitData
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible