Skip to main content

Innovative Solutions in Future Stations, Energy Metering and Power Supply

Deliverables

Creation of communications materials to support the Joint Undertaking’s communications strategy

Communications and Marketing plan implementation and creation of materials to raise the profile of IN2STEMPO and the Shift2Rail Joint Undertaking which may include newsletters, presentations, and videos.

Data Protection Impact Assessment

This deliverable will present a data protection impact assessment to be undertaken before the large-scale trial in Warsaw West station is initiated. This will advise on data collection, storage, protection, retention and destruction and compliance with national and EU legislation.

Mid-term Integration Plan

Plan to be produced to map how the energy integrated demonstrator will be delivered including interface with relevant Open Calls for TDs 3.9 and 3.10. Plan to be produced to map how the station demonstrator will be delivered including interface with relevant Open Calls for TD3.11.

Database

A database providing specification requirements and optimal combinations of glass and fixings that provide different levels of security depending on the risk assessment.

Current specifications and technical problems with Platform Train Interface

Report covering the outputs of tasks 8.1 and 8.2 including list of legislation related to the distance between platform and rolling stock with current solutions. It also includes identifying technical problems associated with access to trains from platforms and results from the surveys.

Dissemination and exploitation plan for IN2STEMPO

Report defining the project dissemination, communication and exploitation strategies including the events and conferences to be targeted for dissemination opportunities.

Reference use cases, scenarios & KPI for standard & emergency operations

This deliverable will contain a description of the topics selected and their relevance with respect to crowd management in large station in normal and emergency operations, the detailed reference use cases and their plausible variants, the description of equipment and data sources required (in functional terms) to assert and experiment the use cases, the KPI selection and definition for outcomes measurement and validation (output of task 6.1). This deliverable will include the outcomes of the Open Call project S2R-OC-IP3-02-2017 (Crowd Flow Analysis in large Train Station areas).

Publications

Optimal Driving Profiles in Railway Systems based on Data Envelopment Analysis

Author(s): Achilleas Achilleos, Markos Anastasopoulos, Anna Tzanakaki, Marius Iordache, Olivier Langlois, Jean-Francois Pheulpin, Dimitra Simeonidou
Published in: Proceedings of the 5th International Conference on Vehicle Technology and Intelligent Transport Systems, 2019, Page(s) 254-259
DOI: 10.5220/0007878002540259

Active power conditioner based on a voltage source converter for harmonics and negative sequence components compensation in electrified railway systems

Author(s): Pinto, J. G.; Tanta, Mohamed; Monteiro, Vítor Duarte Fernandes; Barros, Luis A. M.; Afonso, João L.
Published in: 7th Transport Research Arena (TRA 2018) Conference, 16-19 April 2018, pp.1-10, Vienna, Austria., Issue Annual Proceedings, 2018, Page(s) 1-10
DOI: 10.5281/zenodo.1491309

A Comprehensive Comparison of Rail Power Conditioners Based on Two-level Converters and a V/V Power Transformer in Railway Traction Power Systems

Author(s): Mohamed Tanta, J. G. Pinto, Vítor Monteiro, Antonio P. Martins, Adriano S. Carvalho and João L. Afonso
Published in: 7th Transport Research Arena (TRA 2018) Conference, 16-19 April 2018, pp.1-10, Vienna, Austria., Issue Annual Proceedings, 2018, Page(s) 1-10
DOI: 10.5281/zenodo.1483284