More freedom for car batteries, cargo and drivers
Imagine cities with clean air, peace and quiet, and zero emissions. While this ambitious urban scenario is not impossible, it hinges on the creation of sustainable city logistics and improvements in the mobility and quality of life of Europeans. This is the goal of the EU-funded SYS2WHEEL project, which will develop a transdisciplinary approach. Specifically, it will develop components and systems for a range of commercial battery electric vehicles (cBEVs), and extensions to passenger vehicles and busses. Essential enabling elements in the project are e-motors for both in-wheel and e-axle systems, a novel suspension for in-wheel systems, the in-wheel and e-axle systems themselves, time-sensitive networking, advanced controls, affordable and efficient processes, and scalability and transferability of innovations.
Objective
SYS2WHEEL will provide brand-independent components and systems for integrated 3rd generation commercial battery electric vehicles (cBEVs) for CO2-free city logistics. High efficiency, performance, packaging and modularity enable efficient integration. Mass production costs of e-powertrain components and systems will be considerably reduced, while eliminating negative impact on drivability, safety and reliability. The same components and systems shall be used for different commercial vehicle categories, sub-categories and brands, in urban and inter-urban applications. The project will foster the transition to a broad range of cBEVs and will accelerate market penetration of e-powertrain components and systems. SYS2WHEEL will demonstrate its results on N1 and N2 cBEVs and assesses the related potential for the whole range of L and N category cBEVs as well as extensions to M1 and M2 passenger carriers. Essential enabling elements in SYS2WHEEL are e-motors for both, in-wheel and e-axle systems, a novel suspension for in-wheel systems, the in-wheel and e-axle systems themselves, time-sensitive networking, advanced controls, affordable and efficient processes, as well as scalability/ transferability of innovations. Specifically SYS2WHEEL will reduce costs in mass production by at least 20% through components becoming obsolete and reduction of wiring costs due to application of time-sensitive networks. The powertrain efficiency will be increased by improved e-motor windings, advanced rare-earth magnets, reduced powertrain rotating parts, reduced losses, advanced controls and weight reduction. Affordability, and user-friendliness will be addressed by enhanced modularity and packaging, automotive quality by advanced fail-operational safety and ISO 26262 compliance, modular and scalable technologies and lowered total cost of ownership. Space-saving approaches in SYS2WHEEL lead to more freedom for batteries, cargo and drivers.
Fields of science
Keywords
Programme(s)
Funding Scheme
IA - Innovation actionCoordinator
8010 Graz
Austria
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Participants (15)
34394 Sisli, Istanbul
See on map
1000 Ljubljana
See on map
6901860 Tel Aviv
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
10156 Torino
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
16138 Genova
See on map
10156 Torino To
See on map
93059 Regensburg
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
4400 Steyr
See on map
43710 Santa Oliva
See on map
GU2 7XH Guildford
See on map
1040 Wien
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
1040 Wien
See on map
8045 Graz
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
8434 TILLMITSCH
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
8463 Leutschach
See on map