Deliverables
1st Periodic report on the Trans-National Access programme
Review of the scientific requirements of Narrow Band Imager (NBI) for EST: To set the specification of NBI for EST an analysis of the current and future scientific requirements and science cases is made. (cf. WP 6.3)
Minutes of 1st board meeting. (cf. WP1.1)
Assessment report of suitable Convolutional Neural Network (CNN) architectures. (cf. WP 5.2.3)
Modular WFS Report on the preliminary opto-mechanical design of the demonstrator. (cf. WP 7.4)
Minutes of Kick Off Meeting. (cf. WP1.1)
Report on the design of a large field-of-view field splitter and the specifications for the microlens array. (cf. WP 6.2)
Turbulence Prediction Report on available measurements. (cf. WP 7.3)
Update on metadata recommendations for observational data. (cf. WP2.2)
Report on the NAOJ tests to demonstrate the manufacture of metallic slices of the required width. (cf. WP 6.1)
Report with the optical and mechanical design of the image slicers for both materials. (cf. WP 6.1)
The Report will provide information on the number of applicants and selected scientists for each mobility call, as well as on the country, gender, degree level of the scientists benefitting of the mobility programme. The Report will also include a collection of reports from the visiting scientists at the Host Institutions. (cf. WP3.2)
Report on networking activities for turbulence control 1. (cf. WP2.2)
Report on networking activities for instrumentation 1. (cf. WP2.2)
1st Report on the activities of the EAST TAC and promotion of the Access programmes. (cf. WP2.1)
Simulation Results (cf. WP 7.1)
Report on the WO tests to demonstrate the manufacture of the glass slices of the required width. (cf. WP 6.1)
Report on the inventory of existing software and expressed needs for solar physics data tools. (cf. WP2.2)
Statistics of access provided 1
First report on metadata recommendations for simulation data. (cf. WP2.2)
Report on MCAO Prototype Opto-Mechanical Design. (cf. WP 7.1)
Assessment on virtual access 1
Minutes from 1st Forum meeting. (cf. WP2.1)
Online project management tools integrated in the SOLARNET webpage. (cf. WP1.1)
Preparation of Continued Professional Development material - a seminar for delivery during SOLARNET Schools and content for two workshops. Lecture material, examples of early/late school workshops, solar inspired activities, will be made available through project website. (cf. WP 4.1)
Delivery of first version of SOLARNET website. (cf. WP 4.2)
Data Management Plan. (cf. WP 4.4)
Release of Basic Computational Tools and high-level analysis tools. (cf. WP 5.4.2)
Searching for OpenAIRE data...