It’s ‘work in progress’ at the R2CITIES demo site in Kartal, Turkey
The works involve disassembly, insulation, recycling and site management at this large nursing home building. Roofing and façades have already been dismantled and now insulation is being carried out. Electro-mechanical systems are also being dismantled while excavation work has been completed for a semi-Olympic pool and water tanks at the building site. Drilling operations for heat pump have started and building site waste is being sifted and recycled. We have also set up the necessary linkages between the BIM office, the site management and administration to coordinate the construction works in terms of BIM, design and production. The works planned for the two other buildings in Yakacık district are currently being organised with the project team convening weekly to ensure multidisciplinary coordination.
Keywords
Countries
Türkiye