Livrables
A project website will be setup for the public information including a download section For a professional project corporate identity a branding logo will be prepared Using social media public information related to the project activities results and events as well as the launch of the website will be announced to a broader public
Communication, dissemination and exploitation plan- M12 (s’ouvre dans une nouvelle fenêtre)This document will detail the project communication dissemination and exploitation vision expected goals and targets KPIs materials and tools foreseen targeted audiences and means to reach them dissemination and communication matrix initially identified dissemination opportunities and roles and contributions of the partners relevant exploitation opportunities and envisioned sustainability strategy In its subsequent releases the document will be updated and integrated detailing the results achieved in terms of communication dissemination and exploitation that emerged or achieved along with the project implementation
Layout recommendations for multi fuel stations (separation distances/hazardous areas classification) (s’ouvre dans une nouvelle fenêtre)Determination of safety distances related to the H2 dispenser regarding vulnerability, potential impact in case of failure and definition of hazardous area for the dispenser and its accessories (with the determination of the radius and shapes for each dispenser’s component)
Annual Data Reporting-M6 (s’ouvre dans une nouvelle fenêtre)Quantitative and qualitative project data Visual material related to projects activities
Assessment of dispersion for high pressure H2 (s’ouvre dans une nouvelle fenêtre)The scenarios which need to be modelled and the reason why the use of CFD tools is required (demonstrate that they are realistic scenarios that cannot be assessed using “engineering tools”) will be described in detail. The selected CFD tool swill be described together with the modelling assumptions and validation. The final result is a set of simulations (concentration contour maps).
Annual Data Reporting-M30 (s’ouvre dans une nouvelle fenêtre)Quantitative and qualitative project data. Visual material related to project´s activities.
Benchmarking of risk assessment methodology applied to refuelling stations (s’ouvre dans une nouvelle fenêtre)Risk assessment achieved from existing industrial project to collect data about frequencies risk matrix critical scenarios and applied risk assessment methodology
Best practice guidelines for multi fuel stations (s’ouvre dans une nouvelle fenêtre)Guidelines with a common approach to risk assessment, and impact on the permitting requirements, defining the safe design(s) for hydrogen refuelling stations in a multi-fuel context with layout recommendations between the dispenser and the other components of the refuelling station and hazardous area around H2 dispenser
Annual Data Reporting-M18 (s’ouvre dans une nouvelle fenêtre)Quantitative and qualitative project data Visual material related to projects activities
Communication, dissemination and exploitation plan- M3 (s’ouvre dans une nouvelle fenêtre)This document will detail the project communication dissemination and exploitation vision expected goals and targets KPIs materials and tools foreseen targeted audiences and means to reach them dissemination and communication matrix initially identified dissemination opportunities and roles and contributions of the partners relevant exploitation opportunities and envisioned sustainability strategy In its subsequent releases the document will be updated and integrated detailing the results achieved in terms of communication dissemination and exploitation that emerged or achieved along with the project implementation
Signed endorsement of key stakeholders to strive for the adoption of common rules for the risk assessment and permitting of hydrogen refuelling stations in multi-fuel environment (s’ouvre dans une nouvelle fenêtre)Communication, dissemination and exploitation plan- M36 (s’ouvre dans une nouvelle fenêtre)
This document will detail the project communication, dissemination and exploitation vision, expected goals and targets (KPIs), materials and tools foreseen, targeted audiences and means to reach them (dissemination and communication matrix), initially identified dissemination opportunities and roles and contributions of the partners, relevant exploitation opportunities and envisioned sustainability strategy. In its subsequent releases, the document will be updated and integrated detailing the results achieved in terms of communication, dissemination, and exploitation that emerged or achieved along with the project implementation.
Communication, dissemination and exploitation plan - M45 (s’ouvre dans une nouvelle fenêtre)This document will detail the project communication, dissemination and exploitation vision, expected goals and targets (KPIs), materials and tools foreseen, targeted audiences and means to reach them (dissemination and communication matrix), initially identified dissemination opportunities and roles and contributions of the partners, relevant exploitation opportunities and envisioned sustainability strategy. In its subsequent releases, the document will be updated and integrated detailing the results achieved in terms of communication, dissemination, and exploitation that emerged or achieved along with the project implementation.
Permitting requirements and Risk assessment methodologies for HRS in the EU (First version) (s’ouvre dans une nouvelle fenêtre)This deliverable will describe in detail the permitting rules and regulations incl safety distances and public guidance on risk assessment methodologies and will highlight differences similarities and gaps between rules and approaches taken in different MS A first version will be prepared in M9 to feed into the design of WP2 and WP3 and a revised version will be prepared at the end of the project to consider the progress achieved during this period
Communication, dissemination and exploitation plan-M24 (s’ouvre dans une nouvelle fenêtre)This document will detail the project communication, dissemination and exploitation vision, expected goals and targets (KPIs), materials and tools foreseen, targeted audiences and means to reach them (dissemination and communication matrix), initially identified dissemination opportunities and roles and contributions of the partners, relevant exploitation opportunities and envisioned sustainability strategy. In its subsequent releases, the document will be updated and integrated detailing the results achieved in terms of communication, dissemination, and exploitation that emerged or achieved along with the project implementation.
Permitting requirements and Risk assessment methodologies for HRS in the EU (Intermediate version) (s’ouvre dans une nouvelle fenêtre)Updated version of D1.2 integrating the results emerged during the project implementation.
Fire and explosion hazard assessment summary report (s’ouvre dans une nouvelle fenêtre)The practical consequences of ignited leakages resulting fault on H2 dispensers onto other dispensers and vice versa will be provided. The experimental choices will be justified and described together with the results (pressure traces, heat fluxes, damages). The most efficient safety barriers will also be presented and the performances of some of them will be assessed based on realistic tests.
Set of recommendation for standard (s’ouvre dans une nouvelle fenêtre)Set of recommendations extracted from the best practice and that can be used for future standards establishment or revision.
Permitting requirements and Risk assessment methodologies for HRS in the EU (Final version) (s’ouvre dans une nouvelle fenêtre)Updated version of D1.2 integrating the results emerged during the project implementation.
State of the art - technologies (s’ouvre dans une nouvelle fenêtre)Benchmarking of technologies used in HRS and multi fuels stations with the definition of 3 case study models with process flow diagrams, technology used, architecture and operation conditions range
Publications
Auteurs:
Proust, Christophe. Edited by Vågsæther, Knut; Lach, Agnieszka; Bradley, Derek; Lundberg, Joachim