Work to be done in SOFIA project has been structured in 5 Work packages (WP in the following) whose content is briefly summarized hereafter.
Work Package 1
Finished in previous Report.
Work Package 2
One of the activities included in WP2 has been the elaboration of Level 2Test Plan proposal (D2.1) describing tests to be carried out in Level 2 where finally 4 tests were selected: Unfolding, Compression After Impact (CAI), Interlaminar Fracture Toughness (GIC) and Seven Point Bending (SPB).
Panels requested in D1.1 Level 2 test specimens sizing for the extraction of L2T specimens were provided in 2 shipments dated in January and March, 2022.
Design and manufacturing of tooling necessary for the performance of L2T (only identified the need for SPB test) has also been performed during this reported period as part of WP2 tasks.
Workshop of Level 2 Tests was celebrated by teleconference in March 2022 as a prelude to some Preliminary tests of each type (Unfolding, CAI, GIC and SPB) performed in April 2022
Level 2 experimiental Tests performed by US with ALS supervision obtaining the following objectives:
1) CAI tests results provided a better estimation of DTA for the different laminates tested
2) Unfolding tests results provided info to calculate an allowable value of Interlaminar Normal Stress from ASTM D 6415/D 6415M – 06ae1
3) GIC test were correlated by means of a FEM, obtaining promising results about specimen initial stiffness, deformation and behaviour during crack tip progression.
4) SPB in symmetric and anti-symmetric configurations were also correlated with FEM. Numerical correlation provided important info as the location of the crack initiation and evolution of the damage.
Tests results and numerical correlations are included in Delivery D2.2 Level 2 Test Report & LCA Data delivered in Sepbember2023. Delivery of D2.3. has been performed in October 2023.
Work Package 3
Delivery of D3.1 including the test plan for L3T in December 2022
Design and manufacturing of tooling for L3 Test were also accomplished, so L3T could be performed in July 2023.
Delvery of D3.2 has been postponed due to problems of convergence and it is expected do be delivered in November 2023.
Work Package 4
Dissemination and Communication activities performed as part of WP4 tasks are provided in next paragraphs.
Creation of a logo and brand for the project, present in templates for reports and presentations.
Creation of a specific web sites for project SOFIA within ALESTIS AEROSPACE website (
https://www.alestis.aero/(s’ouvre dans une nouvelle fenêtre)) and APPLUS website (
https://www.appluslaboratories.com/global/en/about-us/innovation/sofia-project(s’ouvre dans une nouvelle fenêtre))
Presence of ALS and APPLUS in JEC world (celebrated in Paris from 03 to 05 May 2022) and USE in MATCOMP 2021 (to be celebrated in June 2022)
Presence of ALS and US in MATCOMP21 (celebrate in June 2022 due to COVID reasons) where SOFIA project was explained in an oral presentation.
Presence of ALS and US in COMPTEST23 with a poster and a short video where SOFIA project was described.
Presence of APPLUS in different expos such as:
-AEROSPACE & DEFENSE MEETINGS SEVILLA
-Farnborough Airshow
- European Rotors
-Aeromart
- FEINDEF
-PARIS AIR SHOW LE BOURGET
Work Package 5
Activities of Project Management and Coordination performed. All deliveries in WP5 haven been delivered.