The project was divided into four stages with milestones and deliverables.
Stage 1 (April 2021 - September 2021) focused on establishing a proof of concept, including literature search, conference online attendance (ASMC online,
https://www.semi.org/en/news-media-press/semi-press-releases/virtual-asmc-2021(se abrirá en una nueva ventana) and CSMantech Virtual 2021,
https://csmantech.org/conference/2021/(se abrirá en una nueva ventana)) testing of GaN samples in one of the existing scanner, assembling and testing a fully operational laboratory set-up, and webpage creation (
https://scientificvisual.ch/gan/(se abrirá en una nueva ventana) https://scientificvisual.ch/sic/(se abrirá en una nueva ventana)).
This stage was successfully concluded with:
Milestone M1: Demonstration of defect visualization of GaN non-intentionally doped crystal using selected radiation source and sensor combination.
Deliverable D1: Acquisition of internal images of GaN crystal as a proof of concept.
Stage 2 (October 2021 - January 2022) involved developing a laboratory prototype, including testing of GaN and 4H-SiC crystals in two of our inspection systems, exploring microscopy and inspection techniques, identifying a new measurement technique, updating webpages, and engaging with prospective customers.
This stage was successfully concluded by:
Milestone M2: Demonstration of scans resolving internal defects and mapping their position in 3D.
Deliverable D2: Minimum Viable Product (MVP). First demonstration to prospective clients.
Stage 3 (February 2022 - September 2022) focused on building an industrial prototype, including contacting manufacturers, defining software functionalities, adjusting the prototype, conducting measurements, and participating in communication events (IWCGT-8, Berlin,
https://iwcgt-8.ikz-berlin.de/(se abrirá en una nueva ventana) ECCG7, Paris,
http://www.escg3-eccg7-paris2022.insight-outside.fr/(se abrirá en una nueva ventana) ICSCRM2022, Davos,
https://icscrm2022.org/(se abrirá en una nueva ventana)).
This stage was successfully accomplished with:
Milestone M3: First letters of intent from prospective clients
Deliverable D3: The development of two industrial prototypes of GaN/SiC inspection systems that are stable, and ready to be customized for the prospective clients.
Stage 4 (October 2022 - March 2023) was dedicated to commercialization, including further software development, adaptation of the tool to other crystals, participation in industrial fairs (Semicon Europa 2022 industrial fair, Munich,
https://www.semiconeuropa.org(se abrirá en una nueva ventana)) and events (European Researchers' Night 2022 event online, Science is Wonderful! event in Brussels), completion of IP courses from WIPO, and patent application for a CRYSTAL WAFERING SYSTEM AND METHOD (“Smart Wafering” see image below).
Milestone 4 (Patent application is assessed and filed. Trademark registration is filed.) and Deliverable 4 (Industrial version of the tool certified and commissioned for client) could not be completed due to delay in assessing the prototypes capability.
In particular, the certification process involves rigorous testing and evaluation. Nonetheless, the delay in completing these tasks has not adversely affected the overall project timeline, as they were scheduled towards the end of the project and they will be concluded in the near future.