LEONSEGS designed, implemented, integrated and validated a service-oriented prototype combining automated Earth observation services with multi-mission ground segment capabilities. The work followed an incremental process based on successive requirements baselines, engineering reviews and prototype releases. The final requirements baseline was frozen and made traceable to the architecture, interfaces, use cases and validation activities.
The prototype includes the main functions required to support satellite missions through a shared ground segment: orbit and event computation, acquisition opportunity analysis, planning and scheduling, operations orchestration, telemetry and telecommand handling, satellite monitoring, payload data processing, product cataloguing and dissemination. It also supports the complete Earth observation user flow, from service selection and request configuration to archive search, satellite tasking, product generation and access to results.
The final prototype release demonstrated an integrated workflow in which an Earth observation request requiring a new acquisition triggered mission selection, acquisition opportunity computation, planning and operational preparation. Simulated raw payload data were subsequently received and processed to generate and disseminate the requested product.
LEONSEGS supports metadata and content-based searches across Sentinel-1, Sentinel-2, Landsat 8/9 and other data sources. Semantic searches consider characteristics such as cloud cover and vegetation, while a Fitness-for-Use Index helps identify the data that best match each request. The platform also retrieves meteorological data and generates provenance and processing-lineage metadata.
Services were implemented for areas in Spain and Austria, including vineyard mapping and monitoring, biomass estimation, archived image search, cloud-free composites, land-cover stability and thermal imaging. Validation covered functionality, interoperability, performance, concurrent requests, usability and product quality. The final assessment concluded that the targeted Technology Readiness Levels 5 and 6 were achieved in a relevant pre-operational environment.