CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
Data Management Plan distinguishing data as private, publishable and Open Access, and defining the main criteria adopted to distinguish among them. Referred to Task 8.2.
Results of investigations of powders' defect chemistry, structural changes, oxygen uptake/release and lattice expansion as a function of doping and operating temperature under long-term cyclic redox operation. Referred to Task 2.3.
Powder redox-relevant properties variation with temperature and pressure. (se abrirá en una nueva ventana)Results of lab-studies on powders of synthesized materials investigating oxygen release/uptake and reaction enthalpies as a function of metal cations composition within a broad temperature and pressure window. Comparison of properties between pristine materials and materials after cyclic testing. Referred to Tasks 2.2 and 2.3.
Project management plan with Gantt chart and Work Breakdown Structure (se abrirá en una nueva ventana)Detailed Project Management Plan with a Gantt chart and a Work Breakdown Structure WBS including a schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks 1st version submitted in M3 Referred to Task 12
Computationally-screened shortlisted redox compositions for further research (se abrirá en una nueva ventana)First shortlist of redox oxide compositions of interest as identified through computational and thermodynamic properties' modeling and calculation of thermodynamic parameters of interest with the aid of commercial and in-house developed codes and software packages. Referred to Task 2.1.
Quality management plan (se abrirá en una nueva ventana)Quality Management Plan to serve as a guide for internal use stating the main procedures and rules on project management implemented for quality assurance of the project and describing the provisions and guidelines adopted by the partners in order to ensure the control of the quality of the project results Referred to Task 12
Launch of project’s website, protected acronym, electronic communications network and social media account. Referred to Task 8.1.
Publicaciones
Autores:
C. Agrafiotis, M. Pein, A. Eltayeb, L. deOliveira, L. Klaas, A.K. Singh, M. Roeb, C. Sattler
Publicado en:
SolarPaces Conference, 2024, ISSN 2751-9899
Editor:
TIB Open Publishing
DOI:
10.52825/SOLARPACES.V2I.862
Autores:
Chrysa Pagkoura; Georgia Kastrinaki; George Karagiannakis
Publicado en:
SolarPACES Conference Proceedings, 2024, ISSN 2751-9899
Editor:
TIB Open Publishing
DOI:
10.52825/SOLARPACES.V2I.906
Autores:
Z. Cao, B. de Leeuw, T. Xie, A.K. Singh
Publicado en:
Case Studies in Thermal Engineering, Edición 63, 105315, 2024, ISSN 2214-157X
Editor:
Elsevier BV
DOI:
10.1016/J.CSITE.2024.105315N
Autores:
M. Pein, J. Keller, C. Agrafiotis, A. Eltayeb, L. Klaas, M. Roeb, C. Sattler
Publicado en:
Advanced Energy Materials,, Edición 14(19), 2304454, 2024, ISSN 1614-6840
Editor:
Wiley
DOI:
10.1002/aenm.202304454
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles