CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
A handbook describing the project management, quality control and risk assessment procedures adopted in the project. In addition, D1.1 will be delivered at the early project stages and will result in defining tangible KPIs for each WP that will be constantly monitored and reported within Periodic Progress Reports.
Project Management Handbook - First Update (se abrirá en una nueva ventana)A handbook describing the project management, quality control, and risk assessment procedures adopted in the project. This version is based on D1.1 and reflects all the updates of the 1st reporting period (M1-M16).
SINNOGENES flexibility requirements, use cases, regulatory barriers and consumer acceptance (se abrirá en una nueva ventana)This deliverable is related to both T2.1 and T2.2 and contains the requirements as well as the SINNOGENES use cases.
An initial draft and a final revised version of the Legal and Ethics Manual will be prepared and issued to assure the ethical assurance, the gender equality and the compliance with national and EU legislation.This deliverable will be an ethics report.
Dissemination and Communication Plan Material-a (se abrirá en una nueva ventana)Report on the planned dissemination and communication activities. The website with all project information and related documentation report will be delivered in M3 and M36. Participation in all the BRIDGE activities. The deliverable is related to T6.1.This deliverable will be a report and a website.
Dissemination and Communication Plan Material-b (se abrirá en una nueva ventana)Report on the planned dissemination and communication activities. The website with all project information and related documentation report will be delivered in M3 and M36. Participation in all the BRIDGE activities. The deliverable is related to T6.1.This deliverable will be a report and a website.
The DMP will provide an analysis of the main elements of the data management policy that will be used by the applications regarding all the research datasets that will be generated by the project.
Publicaciones
Autores:
Vasylyev, A., Vannoni, A., & Sorce, A
Publicado en:
E3S Web of Conferences, 2023, ISSN 2267-1242
Editor:
EDP Sciences
DOI:
10.1051/e3sconf/202341401004
Autores:
Fotopoulou, M., Pediaditis, P., Skopetou, N., Rakopoulos, D., Christopoulos, S., & Kartalidis, A.
Publicado en:
Sustainability, 2024, ISSN 2071-1050
Editor:
MDPI
DOI:
10.3390/su16041572
Autores:
Kansara, R., Lockan, M., & Roldán Serrano, M. I
Publicado en:
Energies, 2024, ISSN 1996-1073
Editor:
MDPI
DOI:
10.3390/en17020350
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles