CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
First version -Identification of main characteristics (capacity, format, chemistry, total number needed, mechanical, thermal and electrical performances needed,…) to specify and purchase the cells for (i) generic design in M3; and (ii) automotive, aeronautics and waterborne specific designs in M6 and specific requirements of novel cells chemestries (in particular Gen4) to be considered for adaptation of battery designs to next cell generations. Related to T2.1 activities, gathering requirements from a broad range of applications (from D5.2, D6.1 and D7.1) and novel chemestries known characteristics, behavior and requirements on system level.
Dissemination and Exploitation plan including communication activities V2 (opens in new window)Periodic plan of the dissemination and exploitation plan including communication activities. Description of the activities developed and planned (clustering activities, events, publications, website, visual materials etc.), timeline, KPIs, audience reached, materials used and visual proof of the activities. Exploitation plan in order to assess the exploitation potential of the developed technologies in terms of KER.Related to task: 8.1 – 8.5
Roadmap for standardisation and certification (opens in new window)Alignment of research activities with relevant standards and certifications. Roadmap for the standardisation and certification of the final scaled-up systems. Related to T8.4 activities.
Dissemination and Exploitation plan including communication activities V1 (opens in new window)Periodic plan of the dissemination and exploitation plan including communication activities. Description of the activities developed and planned (clustering activities, events, publications, website, visual materials etc.), timeline, KPIs, audience reached, materials used and visual proof of the activities. Exploitation plan in order to assess the exploitation potential of the developed technologies in terms of KER.Related to task: 8.1 – 8.5
Quality assurance and risk management plan V2 (opens in new window)Revised version - Under the premises of the contractual, financial and administrative management rules described in the GA and CA, description of the methodologies implemented by the coordinator and the rules to be followed by the whole consortium ensuring a smooth and organised development of the project, covering: internal management structure of the consortium and the advisory board; access and structure of the project database (Sharepoint – D1.4); internal communication rules; IPR management rules; procedures and KPI to ensure the quality standards; risk management plan including mitigation measures. Related to tasks: 1.1 – 1.2 – 1.3
Quality assurance and risk management plan V3 (opens in new window)Final version - Under the premises of the contractual, financial and administrative management rules described in the GA and CA, description of the methodologies implemented by the coordinator and the rules to be followed by the whole consortium ensuring a smooth and organised development of the project, covering: internal management structure of the consortium and the advisory board; access and structure of the project database (Sharepoint – D1.4); internal communication rules; IPR management rules; procedures and KPI to ensure the quality standards; risk management plan including mitigation measures. Related to tasks: 1.1 – 1.2 – 1.3
Module safety tests and simulation (opens in new window)Generic module tests and simulation decription - as defined in testing methodology in section 1.2.1.2 - followed by analysis of results to validate the safety of the combination of all BBs at module level : resistance of the module to TR propagation, mechanical performance and fire resistance. Related to T4.5 activities.
Requirements, use cases and KPIs (automotive applications) (opens in new window)For automotive end-use applications: technical requirements and use cases for prototyping (main use-case for WP6) and extrapolation studies (D5.4), associated with KPIs. Related to T6.1 activities.
Eco-design and scale-up recommendations at module level (opens in new window)Assessment of all the involved technology BBs (feasible materials, formulations and processes) to select best trade-offs between performances (technical and economical), dismountability and sustainability at module level. Related to T4.6 activities.
Requirements, use cases and KPIs (waterborne and other applications) (opens in new window)For waterborne and other end-use applications: technical requirements and use cases for virtual prototyping (main use-case for D5.3) and extrapolation studies (D5.4), associated with KPIs. Related to T5.2 activities.
Cells specifications for (i) generic design; and (ii) automotive, aeronautics and waterborne specific designs V2 (opens in new window)Second version - Identification of main characteristics (capacity, format, chemistry, total number needed, mechanical, thermal and electrical performances needed,…) to specify and purchase the cells for (i) generic design in M3; and (ii) automotive, aeronautics and waterborne specific designs in M6 and specific requirements of novel cells chemestries (in particular Gen4) to be considered for adaptation of battery designs to next cell generations. Related to T2.1 activities, gathering requirements from a broad range of applications (from D5.2, D6.1 and D7.1) and novel chemestries known characteristics, behavior and requirements on system level.
Requirements, use cases and KPIs (aeronautics applications) (opens in new window)For aeronautics end-use applications: technical requirements and use cases for prototyping (main use-case for WP7) and extrapolation studies (D5.4), associated with KPIs. Related to T7.1 activities.
Eco-design and scale-up recommendations at cells unit level (opens in new window)Assessment of all the involved technology BBs at cell units level (feasible materials, formulations and processes) to select best trade-offs between performances (technical and economical), dismountability and sustainability. Related to T3.6 activities.
Summary of performances validation and safety evaluation at module level (BBs 5,6,7) (public version) (opens in new window)Summary (for non-confidential publication) of tests and characterisation results to validate the performances of the BBs 5,6,7 at module level. Related to T4.2, T4.3 and T4.4 activities.
Eco-design and scale-up recommendations at cell level (opens in new window)Development of an LCA tool. Assessment of all the involved technology BBs (feasible materials, formulations and processes) to select best trade-offs between performance (technical and economical) and sustainability (incl. recyclability potential, manufacturability, scalability) at cell level. Related to T2.5 activities.
Quality assurance and risk management plan V1 (opens in new window)First version Under the premises of the contractual financial and administrative management rules described in the GA and CA description of the methodologies implemented by the coordinator and the rules to be followed by the whole consortium ensuring a smooth and organised development of the project covering internal management structure of the consortium and the advisory board access and structure of the project database Sharepoint D14 internal communication rules IPR management rules procedures and KPI to ensure the quality standards risk management plan including mitigation measures Related to tasks 11 12 13