Skip to main content
Go to the home page of the European Commission (opens in new window)
English en
CORDIS - EU research results
CORDIS

Optical control over multi-membrane materials

Periodic Reporting for period 1 - OCOMM (Optical control over multi-membrane materials)

Reporting period: 2023-04-01 to 2025-05-31

Fiber Fabry-Perot cavity above a photonic crystal membrane chip.