Periodic Reporting for period 1 - IFAV3 (INCREASED FLEXIBILITY OF ATCO VALIDATIONS – V3)
Período documentado: 2023-07-01 hasta 2024-12-31
On this basis, IFAV3 will increase the cost efficiency of air traffic control and the productivity of controllers while maintaining at least the same level of safety. In the same way, this research will make air traffic control more robust against lack of personnel or other disruptions.
The objectives of IFAV3 can be summarised as following:
• Continue research of increased flexibility in ATCO validations (IFAV) in the upper airspace; in detail the development, and validation of new training and endorsement concepts, as well as procedural and technical means, towards a V3 / TRL6 maturity;
• Continue research on increased ATC task automation to enable generic controller validations in a separate task, corresponding to a large-scale study;
• Transfer, and refinement of IFAV concepts and means to a remote tower centre (RTC) environment, as very similar challenges exist there as well: the same ATCO staff needs to be deployed with highest possible flexibility to different remote-controlled airports.
• The conceptual work has been almost completed,
• Strategies, technical enablers and procedures were defined in detail,
• The actual design / construction of selected technical enablers started and is still ongoing,
• The preparation of the validation exercises started and is still ongoing,
• Corresponding deliverables were created and submitted according to the project schedule.
The main difference between both project topics (solutions) are the target maturity level, which is V3 / TRL6 for IFAV applied in upper airspace area control centres, and V1 / TRL2 for IFAV applied in remote tower centres.