During the first reporting period (RP1), four main activities started and are in progress:
1. Value chain requirements and communities of practice: the e-methanol value chain was mapped, a survey on the decarbonization of the maritime sector was conducted to identify barriers and opportunities, POSEIDON use cases scenarios (three for each port) were defined and will be further investigated, a report on state of art technologies composing the e-methanol value chain was drafted; work on data collection and model descriptions required for assessments and tool development was started, communities of practice were established in Valencia (26 members) and Thessaloniki (25) and first workshops took place aiming at collecting feedback, tests of membranes for CO2 capture were performed in laboratory,
2. Building of e-methanol pilot plant: detailed engineering of the e-methanaol pilot plant was finalized integrating feedback from quality assurance study, digital twin of pilot plan was developed, purchases of main equipment started (like pressure vessels), construction strategy was fine-tuned,
3. Adaptation of e-fuel test platform: protocols for test campaigns including gas compositions and test parameters were developed, basic engineering study was completed, several tenders for civil, electrical and mechanical works were launched and will allow to have a detailed design of the platform and start the adaptation works, building permit was granted,
4. Value chain assessment: methodologies for economic, technical, environmental and social studies including KPIs and data needs were defined, development of the value chain modelling tool was started: user story and user interface were developed and presented to partners
The next reporting period (RP2) will focus on the demonstration activities, evaluation of scenarios for the two case studies of Valencia and Thessaloniki and the start of the business modelling and replication tasks.