Report on local resource, demand, site survey, and hospital requirements
(s’ouvre dans une nouvelle fenêtre)
Land site surveyed to confirm suitability and any remedial works required. Resource surveys will include access to historic records of wind, solar, and bathometric surveys. Examining the lack of correlation between the energy supplies, use of the latest models for forecasting wind and solar.
The D&C Plan
(s’ouvre dans une nouvelle fenêtre)
Plan to effectively disseminate and communicate the results and knowledge derived from the project and the project itself. Section 2.2
Detailed Project Plans: preliminary designs, techno-econ analysis, budget, Gantt, (Basic project)
(s’ouvre dans une nouvelle fenêtre)
Detailed budget plans based on the techno-economic analysis and tasks in WP1 including: Initial cost appraisals; Elemental cost plan; Approximate quantities cost plan (from the end of detailed design through to tender); Pre-tender estimate (prepared alongside tender documentation); Final cost plan completed. The detailed Project Gannt, (Basic project)
Project Coordination/Management plan
(s’ouvre dans une nouvelle fenêtre)
The Project Initiation Document (PID) will define procedures and processes for project management, progress reporting, financial reporting, dispute resolution
Terms of Reference for the Exploitation Working Group
(s’ouvre dans une nouvelle fenêtre)
H& S Plan
(s’ouvre dans une nouvelle fenêtre)
•Risk assessment using HAZID/ HAZOP for risk identification and mitigation planning.•Scenario development and emergency procedures including Medevac, man/ equipment overboard, •Establish the H&S H2HEAT personnel responsible during the project for all H&S aspects•Training and Communication plan and procedures•H&S cycle through monitoring, evaluation, review and update as detailed in Methodology 1.3.2