CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
Instructions and templates for deliverables and reports. Criteria and rules for the project management procedures, roles, and responsibilities and quality planning, metrics, and control. It will also include a set of guidelines to guarantee the implementation of RRI in a proper manner, defining Open Science topics among others. (T6.1, T6.2, T6.3).
D1.1 Set of KPIs, assessment of emerging technologies and modal share analysis (s’ouvre dans une nouvelle fenêtre)This report will comprise the outputs of the T1.1, T1.2 and T1.3. The document will include 1) the sets of KPIs, 2) the description of the most promising innovations and an estimation of their effects on the modal share of rail in freight, and 3) the freight flows and types of goods with higher potential to shift to rail.
D3.1 ESEP4Freight reference architecture (s’ouvre dans une nouvelle fenêtre)This report will include the outputs of T3.1 and will include the definition of the reference architecture describing the requirements, specifications and data models to build the web-based platform.
D2.1 Specifications for the implementation of blockchain technologies and smart contracts in intermodal transport (s’ouvre dans une nouvelle fenêtre)This report will comprise the outputs of T2.2. It will include the specifications of 1) The informative layer, consisting of a set of specifications for the use of information exchange on event in the supply chain) and of 2) the contractual layer, consisting of a set of specifications for the intermodal trade clauses and milestones including recommendations on rights and duties amongst actors of the supply chain.
D2.2 Analysis of the current legal and contractual framework and upgrade recommendations (s’ouvre dans une nouvelle fenêtre)This report will comprise the outputs from T2.1 and T2.3. It will include the analysis of the legal and contractual framework and a set of recommendations for adapting the current legislation towards a harmonized contractual framework. It will also include the set of model contracts to be included in the Web Platform.
This deliverable will comprise the outputs of T1.4. This will include the datasets and will be accompanied by a document with the data collection plan.
D3.2 ESEP4Freight web-based platform (s’ouvre dans une nouvelle fenêtre)This deliverable will include the outputs of T3.2 and T3.3. It will comprise the final version of the platform, including the back-end modules, the data repository and the front-end.
Data management plan and data quality related parameters, how data will be collected, stored, accessed, exchanged, as well as data approved for publication can be used by others (T6.3). The deliverable will be followed up by the end of the project by D6.3.
Publications
Auteurs:
Celestino Sánchez (Eurnex), Ingrid Nordmark (KTH)
Publié dans:
Global Railway Review, Numéro Volume 30, Numéro 1, 2024
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible