Project management handbook
(s’ouvre dans une nouvelle fenêtre)
Project management handbook (PMH). The PMH will include an updated Ghantt chart and a WBS), reviewed half-yearly and updated if needed, based on feedback within the partnership. The PMH will also include an updated list of identified risks as well as a risk management strategy and clear information on milestones and deliverables (Task 12.1).
D&C plan
(s’ouvre dans une nouvelle fenêtre)
A Report on D&C strategy. The report will contain timing, actions, and monitoring indicators of D&C and will outline the project’s audiences, key messages and communication channels for the dissemination, including roles and responsibilities (Task 9.1).
Ethics plan
(s’ouvre dans une nouvelle fenêtre)
Ethics. Report on ethics issues and considerations (Task 12.3).
Synthesis of catalysts
(s’ouvre dans une nouvelle fenêtre)
Report on graphitic carbon nitride energy-transfer catalyst synthesis. The reposrt will describe the obtained g-CN materials with the optical band ≤ 3 eV, singlet-triplet energy gap ≤ 0.2 eV and lifetime of the triplet excited state ≥ 1 μs.
Data management plan
(s’ouvre dans une nouvelle fenêtre)
Data management plan including plan for open access to research data. The DMP will provide info on what kind of data the project will generate, exploitation, verification, re-use, data standards, curation, and preservation (Task 12.3).
Triplet sensitizer QD performance
(s’ouvre dans une nouvelle fenêtre)
Report on the performance of various triplet sensitizer QDs for isoprene photodimerization. The report will include data on the surface coating optimization to achieve equally high solubility of the QDs in neat isoprene and in dilute solutions of isoprene in alkane solvents.
Update on D&C plan
(s’ouvre dans une nouvelle fenêtre)
Updated report on D&C activities (Update of D33) (Task 9.1).