Skip to main content
Go to the home page of the European Commission (opens in new window)
English en
CORDIS - EU research results
CORDIS

Carbon-negative pressurized hydrogen production from waste using an energy efficient protonic membrane reformer CARMA-H2

Project description

Hydrogen production from biogas through a protonic membrane reformer

Introducing biogas into hydrogen production is crucial for reducing pollution. The EU-funded CARMA-H2 project aims to produce hydrogen from biogas using a protonic membrane reformer (bioPMR). This technology integrates six process steps into a single reactor, achieving over 85 % energy efficiency at the bioPMR level. The bioPMR will deliver purified and pressurised hydrogen at 30 bar and will be coupled with CO2 liquefaction to produce food-grade CO2. The demonstration will take place at the Arazuri wastewater treatment plant in Navarra, Spain. An advanced control system and an associated digital twin will oversee the operation. The project also aims to secure off-take agreements for the hydrogen and liquid CO2 produced.

Objective

CARMA-H2 will enable highly attractive hydrogen production from biogas through demonstration of a protonic membrane reformer (bioPMR) that integrates steam methane reforming and water-gas shift reactions, hydrogen separation, heat management, CO2 capture and hydrogen compression in a single stage. The realization of 6 process steps in a single reactor allows to achieve unprecedented energy efficiency with a project target to demonstrate >85% (HHV) at the bioPMR level. The bioPMR technology enables direct delivery of purified and pressurized H2 (30 bar). BioPMR will be coupled with CO2 liquefaction to enable direct production of food-grade CO2. Coupling the liquefaction unit allows for higher hydrogen recovery and liquid CO2 production as the off-gas from the liquefaction process will be recycled back to the bioPMR unit. CARMA-H2 will demonstrate the bioPMR technology integrated with CO2 liquefaction at the existing Arazuri wastewater treatment plant in the region of Navarra in Spain. The demonstration plant will be operated for at least 4000 h, and produce 500 kg/day of hydrogen and above 4000 kg/day of food-grade CO2. To facilitate the demonstration CARMA-H2 will install 1) a pre-treatment system for biogas compression and removal of sulphur and other impurities, 2) two bioPMR modules which will operate directly on biogas (CO2 > 40 vol.%), and 3) an integrated CO2 liquefaction unit. The demonstration plant will be located in Ebro Valley Hydrogen Corridor, and the project aims to secure off-take of the produced hydrogen and liquid CO2 during operation. The overall system will be controlled and analysed by an advanced control system and an associated digital twin that will be developed in the project. The wastewater plant is currently operating a biogas production plant of >4 MW from which the biogas is utilized for power generation. The achievements in CARMA-H2 will be an important proof of technological feasibility advancing the technology from TRL5 to TRL7.

Keywords

Programme(s)

Topic(s)

Funding Scheme

HORIZON-JU-IA - HORIZON JU Innovation Actions

See all projects funded under this funding scheme

Call for proposal

(opens in new window) HORIZON-JTI-CLEANH2-2023-1

See all projects funded under this call

Coordinator

ASOCIACION DE LA INDUSTRIA NAVARRA
Net EU contribution
€ 1 130 800,00
Address
CARRETERA DE PAMPLONA 1
31191 Cordovilla
Spain
SME
Yes
Region
Centro (ES) Castilla y León Salamanca
Activity type
Research Organisations
Links
Total cost
€ 1 130 800,00

Participants (12)