Update Communication, Dissemination and Clustering strategy plan 1
(opens in new window)
This deliverable includes the actions developed during the first period in terms of dissemination and communication
FL & SL-BESS requirements for interoperation
(opens in new window)
FL and SL-BESS´s requirements for enhanced integration and performance in an interoperability battery framework
Comprehensive requirements for an Interoperable BMS
(opens in new window)
A detailed description of parameters that need to be provided and requirements to meet to safely interoperate batteries in flexible scenarios, including a subdivision by BMS layerrequirements.
Communication, Dissemination and Clustering strategy
(opens in new window)
Communication, Dissemination and Clustering strategy planning the timing, roles actions and monitoring indicators of D&C activities of the project. Clustering strategy plan and reports will be included in the D8.1.
Methodologies for SoX, Self-Diagnosis and RUL algorithms development and data collection
(opens in new window)
Specific methodologies to each of the SoX, Self-Diagnosis and RU1L/RU2L algorithms will be reported (including data processing/feature engineering, clustering, and learning algorithms envisaged). Data collection will be properly addressed and Guidelines for data standardization, including Specific data requirements to develop enhanced SoX and the set of data requirements, duly justified, to be provided by the batteries´ OEMs
ESS conceptual design for SL-BESS use-cases Integration
(opens in new window)
Modular battery system design which can host diverse types of FLB modules, taking into consideration also sizing, power profiles, systems interaction, EO2L forecasting.