Skip to main content
Ir a la página de inicio de la Comisión Europea (se abrirá en una nueva ventana)
español es
CORDIS - Resultados de investigaciones de la UE
CORDIS

Demonstration of sustainable hydropower refurbishment

CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.

Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .

Resultado final

Data Management Plan (se abrirá en una nueva ventana)

DMP from T10.3 with a detailed plan to describe concrete actions for data management, and to inform all partners about how data management are carried out. This also includes a technical description about how, where and when data is managed, stored and shared.

Matrix of future water uses (se abrirá en una nueva ventana)

Deliverable from T5.4 providing a matrix for semi-quantitative analysis of water user satisfaction. It forms the basis for the development of a methodological approach to future water use in climate change scenarios.

Hydropower pressures assessment (se abrirá en una nueva ventana)

Deliverable from T5.6 presenting the first steps of the methodology to assess the hydropower pressures and their impacts on biodiversity. It will describe the results of the literature review and the collaboration between Life Cycle Analysis and hydropower plants experts to identify anthropic pressures on terrestrial and aquatic biodiversity and the indicators which allow to quantify them.

Project Management Plan - Revision 1 (se abrirá en una nueva ventana)

Report from T10.1 with an updated plan with milestones, deliverables and events for coordination and management of ReHydro. The plan will include key elements as why, what, how and when each activity will be performed.

DEC master plan (se abrirá en una nueva ventana)

The DEC master plan from T8.1 will ensure widespread awareness and knowledge transfer of innovative solutions from ReHydro within the hydropower industry. The plan also aims to facilitate the strategic exploitation of these refurbishment measures, fostering their practical implementation to enhance the efficiency, sustainability, and overall performance of hydropower plants on a global scale.

DEC master plan update 1 (se abrirá en una nueva ventana)

Update of the DEC master plan from T8.1 with further descriptions and results of the measures implemented for dissemination, exploitation and communication.

Project Management Plan (se abrirá en una nueva ventana)

Report from T10.1 with a detailed plan with milestones, deliverables and events for coordination and management of ReHydro. The plan will include key elements as why, what, how and when each activity will be performed.

Publicaciones

Effect of Stokes number on erosion on Pelton buckets for sediment-laden flows (se abrirá en una nueva ventana)

Autores: Aron Dagur Beck, Elena Vagnoni
Publicado en: IOP Conference Series: Earth and Environmental Science, Edición 1561, 2025, ISSN 1755-1307
Editor: IOP Publishing
DOI: 10.1088/1755-1315/1561/1/012042

Digital Twin for Vibration Monitoring of Pelton Units (se abrirá en una nueva ventana)

Autores: M Boden, M Chiarelli, V Tsingos, N Allaban, J Decaix, S Stojanovic-Roth, G Blommaert, B Valluy, C Münch-Alligné
Publicado en: IOP Conference Series: Earth and Environmental Science, Edición 1442, 2025, ISSN 1755-1307
Editor: IOP Publishing
DOI: 10.1088/1755-1315/1442/1/012008

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles

Mi folleto 0 0