Livrables
Report on the key requirements, scenario frameworks and KPIs definition for the UCs. In this deliverable, linked to T3.4
Plan for Dissemination, Communication & Exploitation (s’ouvre dans une nouvelle fenêtre)Linked to T9.1, it will be a report at the beginning of the project on the definition of the strategy for implementation of DEC activities, outlining its objectives, target groups, key messages to be delivered, channels and materials, resources to be applied and activities to be carried out in order to maximize the project outreach, together with a set of DEC performance KPIs and target values.
Cable modelling specifications (s’ouvre dans une nouvelle fenêtre)Specification of modelling and IA methods, tools, number of models and algorithms, to be developed in WP5. It will be a report where the specifications, requirements, specific methods to be implemented, the number of models and algorithms to be developed for the project, will be clearly indicated, in order for the different consortium partners participating in WP5 to carry out their tasks in compliance with them. This report will be a guideline for those tasks, enabling their subsequent planning and execution” Linked to T3.2. The document delivery will be an indicator of success, and verifiable by dedicating 1 chapter per identified item above.
Interim progress report I (s’ouvre dans une nouvelle fenêtre)Internal procedure to ensure project progress: technical progress, results, deliverables, compliance with the WP schedule, as defined in D1.1. Linked to T1.1, it is scheduled to serve as an interim checkpoint of project progress in the middle point of the first reporting period.
HVDC cable ageing mechanisms study (s’ouvre dans une nouvelle fenêtre)Report of HVDC ageing indicators that can be measured by fibre-based sensors and enable real time assessment. Linked to T5.1, the report will show the discoveries related to HVDC ageing indicators such as: Thermal stress, electrical degradation, mechanical wear and tear, environmental factors. All these parameters and their relation algorithms will outcome from data measurements and data analytic algorithms used to calibrate mathematic models.
Report on Communication & Dissemination activities I (s’ouvre dans une nouvelle fenêtre)Periodic report containing communication, dissemination and stakeholder mapping. Linked to T9.3 and T9.4, it will include a detailed description of dissemination and communication materials and activities developed in the first year of the project. Performance evaluation according to KPI target values set in D9.1.
Cables systems requirements (s’ouvre dans une nouvelle fenêtre)Specification of material development, norms and restrictions, cross sectional areas and operational temperatures objectives, including eco-design and environmental considerations. Linked to T3.1, the report will include NEX design of a full size HVDC XLPE cable with alternative material to existing technology. NEX will perform all analysis of cable and production processes to succeed in manufacturing and quality control.
DTS and DAS proof-of-concept (s’ouvre dans une nouvelle fenêtre)This deliverable reports the results of the laboratory demonstration of monitoring temperature, strain and acoustic events at long ranges for HVDC cables performed in ST6.1.1. Success of this task and deliverable is assessed by comparing the measurement performance of the demonstrated DAS and DTS systems with the requirements set in T3.3 and reported in D3.3. The delivered report will also explore potential applications beyond traditional cable monitoring, such as in power transmission grids or industrial settings
Specification of enhanced monitoring and fault location systems (s’ouvre dans une nouvelle fenêtre)This deliverable sets requirements for the design of the enhanced monitoring and fault location systems based on fibre optics. The resulting report includes criteria for monitoring at least 125 km fiber length in 525kV HVDC cables, and ensuring accurate fault detection using DTS, DAS, Point Vibration Sensors, and PD analyzer. The success will be measured by the completeness and clarity of the specifications provided to. The specifications need to address critical parameters for the measurement performance, communication, and data transfer, as well as environmental parameters, as outlined in T3.3. Additionally, the alignment of these requirements with the project objectives and technological advancements will serve as indicators of successful specification development.
Gender Action Plan (s’ouvre dans une nouvelle fenêtre)Gender balance and equality analysis of consortium. Linked to T1.3, this report will define the gender equality joint approach implemented in the project, bearing in mind the best practices, gender strategies and commitments established by all partners, to guarantee a gender and diversity inclusive perspective along the action, including a Gender Balance and Gender Equality analysis of the Consortium.