Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
Contenu archivé le 2024-05-27

Optimised 2 Mw wind turbines in high wind speed area with smooth grid integration

Objectif

Demonstrate the durability, reliability of large scale (2MW) variable speed wind turbines with improved performance (5% increase in electricity output) in a high wind speed area (9.8m/s at hub height), resulting in production costs of 0.041/kWh. Demonstrate innovative conversion of wind generated electricity to ensure reduced negative impacts on the electricity network.

The innovation relates to optimised reactive power control, rapid reaction to wind turbulence and active oscillations and harmonics management. Demonstrate additional increase in electricity production by adjusting re-start wind speed threshold (currently set at 20m/s) following turbine cut-out (at 25m/s) using a fuzzy logic approach incorporating historic wind velocities, gusting data and wind energy forecasting.

Thème(s)

Data not available

Appel à propositions

Fifth Energie C
Voir d’autres projets de cet appel

Régime de financement

Data not available

Coordinateur

MIDAS ENERGY LIMITED
Contribution de l’UE
Aucune donnée
Adresse
Lissarda Industrial Estate
LISSARDA, CO. CORK
Irlande

Voir sur la carte

Coût total
Aucune donnée

Participants (3)